Quote:
Originally Posted by r18tdi View Post
I believe that is correct. Renovation and a small vertical expansion.
A small but strategic renovation that will add 44 units that differ from a high-rise, more loft oriented. And complete the Franklin street wall. Truly a filler till the next tower.
Reply With Quote
     
     
  #342  
Old Posted Apr 2, 2024, 1:47 PM
dreamy-developer dreamy-developer is offline
Registered User
 
Join Date: Mar 2024
Location: Chicago, IL
Posts: 7
A recent piece on the second tower from YIMBY.

GOD I really hope this entire mega project pulls through, this is probably my #1 most anticipated development in the entire city.

I wouldn't be surprised if the timeline get's pushed back from the revised 2026 date. Or they would need to hit ground on three 500+ footers by the end of the year. Still really hoping at minimum the next tower goes ahead before the EoY.

Article:
Exterior Work Nears Completion For 868 N Wells Street In Near North Side
Reply With Quote
     
     
  #343  
Old Posted Apr 2, 2024, 6:01 PM
Zapatan's Avatar
Zapatan Zapatan is offline
DENNAB
 
Join Date: Aug 2009
Location: NA - Europe
Posts: 6,063
Quote:
Originally Posted by dreamy-developer View Post
I wouldn't be surprised if the timeline get's pushed back from the revised 2026 date. Or they would need to hit ground on three 500+ footers by the end of the year. Still really hoping at minimum the next tower goes ahead before the EoY.
I hope they can pull that off, It's time to step up the development game, in many other cities that (and much more) would be totally possible.
Reply With Quote
     
     
  #344  
Old Posted Apr 2, 2024, 7:59 PM
BrickellBased BrickellBased is offline
Registered User
 
Join Date: Apr 2023
Location: Miami, FL
Posts: 165
FWIW - Their original timeline on the northunion.com site was out to 2028 I believe. The current timeline on there was moved up from that a couple years and was a lot more ambitious. So in a sense they're still on track with that original timeline.

They bought the land, have it partly built out, and already completed a super large project down the street perfectly (OCS) - I think they'll complete it within the next 4 years.

Quote:
Originally Posted by dreamy-developer View Post
A recent piece on the second tower from YIMBY.

GOD I really hope this entire mega project pulls through, this is probably my #1 most anticipated development in the entire city.

I wouldn't be surprised if the timeline get's pushed back from the revised 2026 date. Or they would need to hit ground on three 500+ footers by the end of the year. Still really hoping at minimum the next tower goes ahead before the EoY.

Article:
Exterior Work Nears Completion For 868 N Wells Street In Near North Side
Reply With Quote
     
     
  #345  
Old Posted Apr 2, 2024, 8:56 PM
gandalf612 gandalf612 is offline
Registered User
 
Join Date: Nov 2018
Location: Andersonville, Chicago
Posts: 248
Quote:
Originally Posted by BrickellBased View Post
FWIW - Their original timeline on the northunion.com site was out to 2028 I believe. The current timeline on there was moved up from that a couple years and was a lot more ambitious. So in a sense they're still on track with that original timeline.

They bought the land, have it partly built out, and already completed a super large project down the street perfectly (OCS) - I think they'll complete it within the next 4 years.
Exactly with the speed they pulled off OCS I don't have any concern
Reply With Quote
     
     
  #346  
Old Posted Apr 3, 2024, 12:47 AM
dreamy-developer dreamy-developer is offline
Registered User
 
Join Date: Mar 2024
Location: Chicago, IL
Posts: 7
Quote:
Originally Posted by BrickellBased View Post
FWIW - Their original timeline on the northunion.com site was out to 2028 I believe. The current timeline on there was moved up from that a couple years and was a lot more ambitious. So in a sense they're still on track with that original timeline.

They bought the land, have it partly built out, and already completed a super large project down the street perfectly (OCS) - I think they'll complete it within the next 4 years.
That's probably the one thing that keeps me believing the pace of the project means little, JDL have not disappointed Chicago yet, and I have a lot of faith in them that they'll pull through with it.

Wasn't trying to be all "doom and gloom", just really hope to see something on this dev soon.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > Skyscraper & Highrise Construction
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 12:24 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.