Old Posted Jul 14, 2015, 5:05 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Ottawa
Posts: 12,328
VIA Rail network developments

Do we not have a dedicated VIA Rail thread here? Move this if we do...
Reply With Quote
     
     
  #2  
Old Posted Jul 14, 2015, 5:06 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Ottawa
Posts: 12,328
Via Rail seeks public-private partnership to fund Toronto-Ottawa-Montreal project

Canadian Press
Published on: June 30, 2015 | Last Updated: June 30, 2015 11:28 AM EDT


Via Rail is attempting to attract money from institutional investors like the Caisse de dépôt et placement du Québec to help generate private investments worth $3 billion for its railway infrastructure.

The Crown corporation expressed its desire to start a public-private partnership to improve its rails and increase the train frequency between Toronto, Ottawa and Montreal.

On Tuesday morning, Via Rail president Yves Desjardins-Siciliano outlined the company’s strategy and outlined its recent successes in other parts of the country.

Aside from the Caisse de dépôts, other institutions like the Ontario Teachers’ Pension Plan and Omers have shown interest in Via Rail’s project.

Desjardins-Siciliano said he expects the money is available within Canada’s private sector but will welcome interest from foreign investors during the coming months.

Via Rail said the railways’ use by several companies transporting merchandise is having a negative effect on the rails because of increased traffic.

Between 2010 and 2014, the number of people using Via Rail’s services dropped from 4.1 million to 3.8 million. The company’s deficit reached $317 million.

http://montrealgazette.com/business/...ntreal-project
Reply With Quote
     
     
  #3  
Old Posted Jul 14, 2015, 5:08 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Ottawa
Posts: 12,328
Via seeks faster service on Montreal-Ottawa-Toronto corridor

Michael Prentice, OBJ
Published on July 13, 2015


Ottawa will be a big winner if Via Rail is successful in its bid to raise $3 billion in private funding to improve train service in the Montreal-Ottawa-Toronto corridor, OBJ has learned.

Most of Via’s proposed improvements would be on the line between Ottawa and Toronto, Via president Yves Desjardins-Siciliano said in an exclusive interview recently.

Via's chief executive appears optimistic the government-owned passenger rail company will raise the money required to improve service between Montreal and Toronto and turn the corridor from a money-loser into a profitable venture.

Under Via’s proposed improvements, travel time between Ottawa and Toronto would be slashed to as little as two hours and 30 minutes, making it competitive with flying and much faster than travelling by car or bus. Currently, the fastest trains between the two cities take almost four hours.

Train service along the Montreal-Ottawa-Toronto corridor is now slow and infrequent. Via says it loses $48 for each passenger it carries on the route – a sum covered by the federal government in its annual subsidy to Via of about $300 million.

Mr. Desjardins-Siciliano believes he can make service profitable in the corridor by slashing journey times and doubling the number of trains.

Right now, rail service linking Canada’s three largest eastern cities operates in a triangle, rather than a corridor. But if Via’s ambitious plans are successful, trains will speed between Montreal and Toronto, with a stop in Ottawa, in as little as three hours and 50 minutes.

The journey time between Ottawa and Montreal would be cut to about one hour and 20 minutes, about 30 minutes faster than the current fastest time. The rail link between downtown Ottawa and downtown Montreal would be faster than taking a car, bus or even a plane, taking check-in times into account.

Via is now in discussions with major investors – notably pension funds – in the hope of persuading them to invest in the proposed service improvements.

We’re now well into the 21st century, so why is Via considering $3 billion in service improvements that will still only put us in the 20th century?

Super-high-speed trains, such as those in Europe and Japan, would cost billions of dollars in government subsidies, and few if anyone in Canada wants to pay for them. Via estimates it would cost at least $9 billion to introduce super-high-speed trains serving Ottawa, Montreal and Toronto.

One of the company’s biggest problems is that it has to share tracks – which are often old and dilapidated – with freight trains.

Under Via’s proposed improvements, $2 billion would be spent on new tracks or renovations to existing tracks. Most of the rest would be spent on doubling the fleet of trains that serve the Montreal-Ottawa-Toronto routes. Via would have exclusive use of about 25 per cent of all track on the corridor.

Via estimates these improvements would enable it to operate the Montreal-Ottawa-Toronto routes with an annual profit of about 15 per cent. That profit would then be shared between Via and the private investors.

Via has not yet indicated how such profits, if any, would be shared with investors. Mr. Desjardins-Siciliano told OBJ he expects the partners to get “a handsome return on their investment.”

Canadian taxpayers also stand to gain, he said, since he expects profitability in the Montreal-Ottawa-Toronto corridor to “eliminate a chunk of the federal subsidy.”

A big reason super-high-speed train service is so expensive is that it requires exclusive use of track, with no railroad crossings, added Mr. Desjardins-Siciliano.

He estimated it would take 12 to 15 years to implement the plan. The improvements proposed by Via can be introduced gradually, he said.

If investors are found and if the federal government approves Via’s plans, service improvements could begin within 18 months to two years after that, the Via chief told OBJ.

http://www.obj.ca/Local/2015-07-13/a...nto-corridor/1
Reply With Quote
     
     
  #4  
Old Posted Jul 14, 2015, 6:01 PM
daud's Avatar
daud daud is offline
Registered User
 
Join Date: Jun 2012
Location: Ottawa
Posts: 739
Quote:
Originally Posted by rocketphish View Post
Via seeks faster service on Montreal-Ottawa-Toronto corridor

Michael Prentice, OBJ
Published on July 13, 2015


Ottawa will be a big winner if Via Rail is successful in its bid to raise $3 billion in private funding to improve train service in the Montreal-Ottawa-Toronto corridor, OBJ has learned.

Under Via’s proposed improvements, travel time between Ottawa and Toronto would be slashed to as little as two hours and 30 minutes, making it competitive with flying and much faster than travelling by car or bus. Currently, the fastest trains between the two cities take almost four hours.

Mr. Desjardins-Siciliano believes he can make service profitable in the corridor by slashing journey times and doubling the number of trains.

The journey time between Ottawa and Montreal would be cut to about one hour and 20 minutes, about 30 minutes faster than the current fastest time. The rail link between downtown Ottawa and downtown Montreal would be faster than taking a car, bus or even a plane, taking check-in times into account.

http://www.obj.ca/Local/2015-07-13/a...nto-corridor/1
This would be such a welcome service from my standpoint and sorely needed from Via's business position. Currently I drive to Toronto for business because I usually need to go with less than 2 weeks notice and while there are 50+ flights a day, they are all over $500 with the short notice. I prefer the train but have constantly opted to drive because driving is faster. Also, hoping on a train to Montreal with a 1 hr 20 minute ride makes a day trip even easier-almost providing a "regional" type service.
Reply With Quote
     
     
  #5  
Old Posted Jul 16, 2015, 9:01 PM
c_speed3108 c_speed3108 is offline
Registered User
 
Join Date: May 2007
Posts: 1,808
Quote:
Originally Posted by daud View Post
This would be such a welcome service from my standpoint and sorely needed from Via's business position. Currently I drive to Toronto for business because I usually need to go with less than 2 weeks notice and while there are 50+ flights a day, they are all over $500 with the short notice. I prefer the train but have constantly opted to drive because driving is faster. Also, hoping on a train to Montreal with a 1 hr 20 minute ride makes a day trip even easier-almost providing a "regional" type service.
Something I really wish via would add is late evening trains between Ottawa and Montreal. Departing somewhere around 11 PM. That would actually enable you to go attend things in Montreal without the expense of staying the night.
Reply With Quote
     
     
  #6  
Old Posted Dec 9, 2023, 3:03 PM
Buggys Buggys is offline
Registered User
 
Join Date: Dec 2012
Location: Ottawa
Posts: 659
Apparently a new federal department is currently being formed to look into high frequency rail between Toronto & Quebec city. Not sure why Niagara to Toronto is not included.

https://hfr-tgf.ca/


Quote:
Originally Posted by rocketphish View Post
Via seeks faster service on Montreal-Ottawa-Toronto corridor

Michael Prentice, OBJ
Published on July 13, 2015


Ottawa will be a big winner if Via Rail is successful in its bid to raise $3 billion in private funding to improve train service in the Montreal-Ottawa-Toronto corridor, OBJ has learned.

Most of Via’s proposed improvements would be on the line between Ottawa and Toronto, Via president Yves Desjardins-Siciliano said in an exclusive interview recently.

Via's chief executive appears optimistic the government-owned passenger rail company will raise the money required to improve service between Montreal and Toronto and turn the corridor from a money-loser into a profitable venture.

Under Via’s proposed improvements, travel time between Ottawa and Toronto would be slashed to as little as two hours and 30 minutes, making it competitive with flying and much faster than travelling by car or bus. Currently, the fastest trains between the two cities take almost four hours.

Train service along the Montreal-Ottawa-Toronto corridor is now slow and infrequent. Via says it loses $48 for each passenger it carries on the route – a sum covered by the federal government in its annual subsidy to Via of about $300 million.

Mr. Desjardins-Siciliano believes he can make service profitable in the corridor by slashing journey times and doubling the number of trains.

Right now, rail service linking Canada’s three largest eastern cities operates in a triangle, rather than a corridor. But if Via’s ambitious plans are successful, trains will speed between Montreal and Toronto, with a stop in Ottawa, in as little as three hours and 50 minutes.

The journey time between Ottawa and Montreal would be cut to about one hour and 20 minutes, about 30 minutes faster than the current fastest time. The rail link between downtown Ottawa and downtown Montreal would be faster than taking a car, bus or even a plane, taking check-in times into account.

Via is now in discussions with major investors – notably pension funds – in the hope of persuading them to invest in the proposed service improvements.

We’re now well into the 21st century, so why is Via considering $3 billion in service improvements that will still only put us in the 20th century?

Super-high-speed trains, such as those in Europe and Japan, would cost billions of dollars in government subsidies, and few if anyone in Canada wants to pay for them. Via estimates it would cost at least $9 billion to introduce super-high-speed trains serving Ottawa, Montreal and Toronto.

One of the company’s biggest problems is that it has to share tracks – which are often old and dilapidated – with freight trains.

Under Via’s proposed improvements, $2 billion would be spent on new tracks or renovations to existing tracks. Most of the rest would be spent on doubling the fleet of trains that serve the Montreal-Ottawa-Toronto routes. Via would have exclusive use of about 25 per cent of all track on the corridor.

Via estimates these improvements would enable it to operate the Montreal-Ottawa-Toronto routes with an annual profit of about 15 per cent. That profit would then be shared between Via and the private investors.

Via has not yet indicated how such profits, if any, would be shared with investors. Mr. Desjardins-Siciliano told OBJ he expects the partners to get “a handsome return on their investment.”

Canadian taxpayers also stand to gain, he said, since he expects profitability in the Montreal-Ottawa-Toronto corridor to “eliminate a chunk of the federal subsidy.”

A big reason super-high-speed train service is so expensive is that it requires exclusive use of track, with no railroad crossings, added Mr. Desjardins-Siciliano.

He estimated it would take 12 to 15 years to implement the plan. The improvements proposed by Via can be introduced gradually, he said.

If investors are found and if the federal government approves Via’s plans, service improvements could begin within 18 months to two years after that, the Via chief told OBJ.

http://www.obj.ca/Local/2015-07-13/a...nto-corridor/1
Reply With Quote
     
     
  #7  
Old Posted Dec 9, 2023, 7:37 PM
phil235's Avatar
phil235 phil235 is offline
Registered User
 
Join Date: Sep 2006
Location: Ottawa
Posts: 3,765
Quote:
Originally Posted by Buggys View Post
Apparently a new federal department is currently being formed to look into high frequency rail between Toronto & Quebec city. Not sure why Niagara to Toronto is not included.
]
Where did you see that there will be a new federal department?
Reply With Quote
     
     
  #8  
Old Posted Jul 14, 2015, 5:49 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Kingston, Ontario
Posts: 11,482
$3 billion is cheap enough that the federal government should simply just pay for it. That way, instead of having to share the resulting profit with investors, the federal government can pocket all of it and spend further on more improvements.

That said, it's exactly what we've needed. To date all proposals have just been massively expensive 300km/h trains; this is small enough to be pragmatic and thus possible in our fiscal climate.
Reply With Quote
     
     
  #9  
Old Posted Jul 14, 2015, 5:52 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Kingston, Ontario
Posts: 11,482
The main bottleneck between Toronto & Ottawa is in Smiths Falls; there, VIA trains have to travel through a CP freight yard to connect between two subdivisions, which requires them to slow to a crawl, and can occasionally (thankfully pretty rarely) cause delays of about 20-30 minutes due to CP freight movements.

I've heard VIA plans to pay CP to move their yard outside the town to remove the bottleneck; if CP is not forthcoming a new railway line to bypass the town is possible but potentially politically difficult (as any new transportation corridor tends to be).

Here in Ottawa, these plans will almost certainly include grade separation of the Trillium/VIA interchange (as it puts scheduling constraints on VIA) which would be a much-needed boost to the Trillium line. The Fallowfield/Woodroffe crossings, however, probably won't be, as they aren't a huge burden on VIA (the trains are already slow through there due to the station).
Reply With Quote
     
     
  #10  
Old Posted Jul 14, 2015, 6:44 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Kingston, Ontario
Posts: 11,482
The Ottawa-Toronto line specifically has actually done quite well in recent years; ridership has climbed a lot (in one recent year, I'm pretty sure 2013->2014, it actually climbed 38% in just that one year!), and they've added a lot more trains. We've gone from something like 60 trains to a week to close to a 100 in the past 5 years; Friday specifically has jumped from 5 departures to 8.

This project could tie in very well with the GO RER project in Toronto. Because Union will be the main hub of the RER lines, it will make huge swaths of the GTA very accessible for VIA connections. An Ottawan going to a meeting in Markham or Mississauga could easily take trains to get there.

With regional RER connections to places like Hamilton, Barrie, and Kitchener, and new rapid transit lines in Ottawa, Toronto, and Kitchener-Waterloo, combined with improved VIA services, it will amount to an efficient transit network connecting millions of Ontarians.
Reply With Quote
     
     
  #11  
Old Posted Jul 14, 2015, 7:13 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 15,860
This reminds me of the Kitchener bullet train from the last provincial election (which has since disappeared). Hardly any train service in the world is profitable and even fewer pay the capex privately, hard to believe they would make a profit on the operating cost and enough of a surplus to pay the investors a return on the investment.

I wonder if this is just an election gimmick or if this is the first step of a plan to just ask the government for $3B ("sorry boss, we tried to get private investors and they wouldn't bite")
Reply With Quote
     
     
  #12  
Old Posted Jul 14, 2015, 7:21 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Kingston, Ontario
Posts: 11,482
Quote:
Originally Posted by acottawa View Post
This reminds me of the Kitchener bullet train from the last provincial election (which has since disappeared). Hardly any train service in the world is profitable and even fewer pay the capex privately, hard to believe they would make a profit on the operating cost and enough of a surplus to pay the investors a return on the investment.
There's currently an EA being done for that one that was launched last fall.

Quote:
Originally Posted by acottawa View Post
I wonder if this is just an election gimmick or if this is the first step of a plan to just ask the government for $3B ("sorry boss, we tried to get private investors and they wouldn't bite")
If it isn't a serious investment plan (though given the interest it has generated from a number of high profile investors I'd disagree with you on that one), it would be latter. Nobody from the CPC has said a peep about it and VIA has had this in the works for quite some time now.

That said, the timing of this around the election is suspicious. It makes me think this is an attempt by VIA to make this plan an election issue.
Reply With Quote
     
     
  #13  
Old Posted Jul 14, 2015, 7:33 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 15,860
Quote:
Originally Posted by 1overcosc View Post
There's currently an EA being done for that one that was launched last fall.
Yeah, for "bi-directional service"
http://www.therecord.com/news-story/...rts-this-year/

A far cry from the pre-election promise of high speed rail.
Reply With Quote
     
     
  #14  
Old Posted Jul 14, 2015, 7:48 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Kingston, Ontario
Posts: 11,482
Quote:
Originally Posted by acottawa View Post
Yeah, for "bi-directional service"
http://www.therecord.com/news-story/...rts-this-year/

A far cry from the pre-election promise of high speed rail.
No, there's a separate high speed rail EA going on too, in addition to the RER one.

http://news.ontario.ca/mto/en/2014/1...peed-rail.html

Two-way all day GO to Kitchener and the Toronto-London HSR were always meant to be separate projects/services (albeit sharing a lot of common infrastructure). The former has a higher chance of happening, though.
Reply With Quote
     
     
  #15  
Old Posted Jul 14, 2015, 7:51 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 11,597
Quote:
Originally Posted by acottawa View Post
Yeah, for "bi-directional service"
http://www.therecord.com/news-story/...rts-this-year/

A far cry from the pre-election promise of high speed rail.
That's not the same thing. The plan Is to have 2 lines operating on the corridor, HSR and GO. That would be for the local GO transit service, while the HSR EA is for the high speed express trains that will run to London.
Reply With Quote
     
     
  #16  
Old Posted Jul 14, 2015, 7:33 PM
eternallyme eternallyme is offline
Registered User
 
Join Date: Mar 2009
Posts: 5,243
Regarding that $48 subsidy...that is pretty low compared to other lines. Before the Ontario government shut it down, the ONTC Northlander to Northern Ontario had a subsidy of over $400 per passenger, meaning they could essentially buy them all new cars for the same price if they were regular users.
Reply With Quote
     
     
  #17  
Old Posted Jul 15, 2015, 3:36 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Kingston, Ontario
Posts: 11,482
I believe the maximum speed of the current equipment is about ~165km/h. I've measured the speed of trains using my phone GPS from Kingston to Ottawa before. VIA attains speeds of 160-165 between Smiths Falls and just southwest of Barrhaven, and between Ganonoque and Kingston Mills.
Reply With Quote
     
     
  #18  
Old Posted Jul 15, 2015, 4:39 PM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 11,866
I really do hope that they maintain service on the Montreal-Toronto mainline and not divert all trains through Ottawa. This is a big detour and you will never be able to obtain optimal service speed with this detour. I think the potential demand will be sufficient to have separate service between all three cities.
Reply With Quote
     
     
  #19  
Old Posted Jul 15, 2015, 4:45 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Kingston, Ontario
Posts: 11,482
Quote:
Originally Posted by lrt's friend View Post
I really do hope that they maintain service on the Montreal-Toronto mainline and not divert all trains through Ottawa. This is a big detour and you will never be able to obtain optimal service speed with this detour. I think the potential demand will be sufficient to have separate service between all three cities.
Agreed. Diverting all trains through Ottawa makes sense only when talking about real HSR (250-350km/h type stuff). At the 160km/h speed that's achievable with this dedicated tracks project, the added kilometres through Ottawa would make the Toronto-Montreal trip only marginally faster than driving even with the faster speed.

That said, if improved to 160km/h the whole way, a detour through Ottawa would be able to roughly match current travel time on the mainline... but it's not an improvement, which is what we want out of this.
Reply With Quote
     
     
  #20  
Old Posted Jul 15, 2015, 5:02 PM
eternallyme eternallyme is offline
Registered User
 
Join Date: Mar 2009
Posts: 5,243
Is there any way they could rebuild the Government Conference Centre as Union Station? The challenge is reconnecting the tracks from Hurdman over to the GCC...
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 10:02 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.