Looks like they are prepping to pour the Mat pretty soon. Sheeting installed and caisson tops exposed.
Sheeting installed at other locations as well. I don't remember this thing having a really deep basement or anything, so probably just enough sheeting to go down 3 or 4 feet to install shallow foundations?
Case was also disassembling one of their drill rigs, so it looks like caissons may be mostly installed. Excavation and shallow foundations should start very soon.