HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive


University of Texas System Headquarters in the SkyscraperPage Database

Building Data Page   • Austin Skyscraper Diagram

Map Location

 

 
Thread Tools Display Modes
     
     
  #1  
Old Posted Aug 21, 2014, 6:04 AM
KevinFromTexas's Avatar
KevinFromTexas KevinFromTexas is offline
Meh
 
Join Date: Jul 2001
Location: Austin <------------> Birmingham?
Posts: 57,326
AUSTIN | University of Texas System Headquarters | 270 FEET | 19 FLOORS

Map:
http://goo.gl/maps/e5zab

It will occupy the southern half of the block north of West 7th Street between Lavaca and Colorado Streets.

http://www.statesman.com/news/news/p...-grows-/ng6Lm/
Quote:
Updated: 10:02 p.m. Wednesday, Aug. 20, 2014 | Posted: 5:14 p.m. Wednesday, Aug. 20, 2014
Plan for UT System’s downtown Austin offices grows to $133.1 million

By Ralph K.M. Haurwitz
American-Statesman Staff

The University of Texas System’s once-stalled plan to build a new headquarters in downtown Austin is moving forward — albeit four stories taller and 30 percent more expensive than originally planned, and with some last-minute design issues raised by two regents.

The Board of Regents’ facilities committee on Wednesday approved the expansion to 19 stories and $133.1 million, and the full board is expected to sign off Thursday.
__________________
Conform or be cast out.

Last edited by KevinFromTexas; Aug 21, 2014 at 6:26 AM.
     
     
  #2  
Old Posted Aug 21, 2014, 6:07 AM
KevinFromTexas's Avatar
KevinFromTexas KevinFromTexas is offline
Meh
 
Join Date: Jul 2001
Location: Austin <------------> Birmingham?
Posts: 57,326
Permits

Water and waste water utilities.
ftp://ftp.ci.austin.tx.us/ATD_AULCC/...Bldg_PLANS.pdf

Right of way permit.
https://www.austintexas.gov/devrevie...erRSN=11129390
Quote:
"101-690 UNIVERSITY OF TEXAS SYSTEM REPLACEMENT OFFICE BUILDING - NEW ~16 story HIGH RISE ON SOUTH HALF OF BLOCK 82 (7th Street between Lavaca and Colorado Streets). Improvements will include connection to existing subsurface utilities, pavements, driveways and alleyway maneuvering areas for heavy trucks. Demo existing structures, the Colorado Building (6 stories plus basement), the Lavaca Building (2 stories), Parking Garage 5 (two levels). We have met with the CIP project team working on the Colorado Street rebuild north of 7th Street. Overhead utility services have already been relocated to below grade adjacent to the project. Address Range Street Cross Street 1 Cross Street 2 190 to 310 W. 7th Lavaca St Colorado St 190 to 310 Alley north of W. 7th Lavaca St Colorado St 620 to 800 Lavaca St W. 7th St W. 8th St 620 to 800 Colorado St W. 7th St W. 8th St"
Civil engineering site plans.
ftp://ftp.ci.austin.tx.us/ATD_AULCC/...ding_PLANS.pdf

https://www.austintexas.gov/devrevie...erRSN=11151129
Quote:
A. Contractor to install covered walkways and water filled barriers at the project perimeter as shown in the attached TCP. B. Contractor must utilize this area due to the fact that the proposed builidng footprint will be lot line to lot line. C. Contractor must close sidewalk, parking lanes and travel lanes per the attached TCP in order to safely completion the construction activities.
Drilling permit for soil samples.
https://www.austintexas.gov/devrevie...erRSN=11126948
Quote:
Drill one 4-inch diameter boring in the street ROW to a maximum depth of 80 feet using a truck mounted drill rig. Work is for a geotechnical evaluation of site for a UT Office Building replacement.
__________________
Conform or be cast out.
     
     
  #3  
Old Posted Aug 21, 2014, 6:24 AM
KevinFromTexas's Avatar
KevinFromTexas KevinFromTexas is offline
Meh
 
Join Date: Jul 2001
Location: Austin <------------> Birmingham?
Posts: 57,326
The location is at 702 Colorado Street at the current location of the Colorado Building. This building was built in 1933. UT owns the building and will demolish it along with another 2-story building and a small parking garage for the new tower.



It will pretty much completely fill the middle portion of the photo.

__________________
Conform or be cast out.
     
     
  #4  
Old Posted Aug 21, 2014, 8:51 AM
KevinFromTexas's Avatar
KevinFromTexas KevinFromTexas is offline
Meh
 
Join Date: Jul 2001
Location: Austin <------------> Birmingham?
Posts: 57,326
http://www.dailytexanonline.com/2014...m-headquarters
Quote:
Regents' committee approves changes to new UT System headquarters

Published on August 20, 2014 at 4:18 pm
Last update on August 21, 2014 at 12:34 am
BY ALEX WILTS

Expected to be completed in 2017, the new building will be located on Seventh Street between Colorado and Lavaca streets, across from Ashbel Smith Hall, which houses the current board meeting room.

The project was first approved in 2012 with a project cost of more $102.4 million. The proposed design changes increases the number of floors from 15 to 19 and the total square footage from 258,500 to 342,200.

The building will be constructed according to commercial design standards with the intention that 30 percent of it will be leased to outside tenants and 70 percent will be used as open space.
__________________
Conform or be cast out.
     
     
  #5  
Old Posted Aug 21, 2014, 9:09 AM
blacktrojan3921's Avatar
blacktrojan3921 blacktrojan3921 is offline
Regina rhymes with fun!
 
Join Date: Jun 2010
Location: Regina, SK
Posts: 887
Couldn't they have saved the facade at least? :C
     
     
  #6  
Old Posted Aug 22, 2014, 3:28 AM
KevinFromTexas's Avatar
KevinFromTexas KevinFromTexas is offline
Meh
 
Join Date: Jul 2001
Location: Austin <------------> Birmingham?
Posts: 57,326
Renderings. Judging from them I'd say it's between 275 and 290 feet tall.









__________________
Conform or be cast out.
     
     
  #7  
Old Posted Aug 22, 2014, 4:08 AM
KevinFromTexas's Avatar
KevinFromTexas KevinFromTexas is offline
Meh
 
Join Date: Jul 2001
Location: Austin <------------> Birmingham?
Posts: 57,326
I can't say I'm crazy about the design, but it will have street level retail.
__________________
Conform or be cast out.
     
     
  #8  
Old Posted Aug 22, 2014, 7:45 AM
LMich's Avatar
LMich LMich is offline
Midwest Moderator - Editor
 
Join Date: Jan 2002
Location: Big Mitten
Posts: 31,745
Yeah, the massing is kind of clumsy, really, and the design looks like something out of the 80's. Can't say I was expecting this. I guess the good thing about it is that it at least fills the site if that's any consolation.
__________________
Where the trees are the right height
     
     
  #9  
Old Posted Oct 3, 2014, 12:59 AM
KevinFromTexas's Avatar
KevinFromTexas KevinFromTexas is offline
Meh
 
Join Date: Jul 2001
Location: Austin <------------> Birmingham?
Posts: 57,326
__________________
Conform or be cast out.
     
     
  #10  
Old Posted Oct 3, 2014, 1:01 AM
KevinFromTexas's Avatar
KevinFromTexas KevinFromTexas is offline
Meh
 
Join Date: Jul 2001
Location: Austin <------------> Birmingham?
Posts: 57,326
__________________
Conform or be cast out.
     
     
  #11  
Old Posted Jun 12, 2015, 1:28 AM
Urbannizer's Avatar
Urbannizer Urbannizer is online now
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,380
6/10



     
     
  #12  
Old Posted Jun 23, 2015, 8:18 PM
Urbannizer's Avatar
Urbannizer Urbannizer is online now
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,380
Second crane went up over the weekend.


https://www.facebook.com/BuildingATX
     
     
  #13  
Old Posted Aug 4, 2015, 5:19 AM
Urbannizer's Avatar
Urbannizer Urbannizer is online now
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,380
From today, by me



__________________
HAIF
     
     
  #14  
Old Posted Sep 14, 2015, 4:19 AM
Sic'EmBears's Avatar
Sic'EmBears Sic'EmBears is offline
Registered User
 
Join Date: Sep 2011
Location: Dallas
Posts: 2,221
From my Photobucket this past weekend:

UT System Headquarters

     
     
  #15  
Old Posted Sep 14, 2015, 4:28 AM
photoLith's Avatar
photoLith photoLith is offline
Ex Houstonian
 
Join Date: Feb 2008
Location: Pittsburgh n’ at
Posts: 15,493
Was this building designed I'm 1991? Sheesh that's bad and replacing an Art Deco building on top of that.
__________________
There’s no greater abomination to mankind and nature than Ryan Home developments.
     
     
  #16  
Old Posted Sep 14, 2015, 4:36 AM
mrsmartman's Avatar
mrsmartman mrsmartman is offline
Registered User
 
Join Date: Apr 2015
Posts: 502
The new UT System HQ is really big.
     
     
  #17  
Old Posted Jan 2, 2016, 5:28 AM
KevinFromTexas's Avatar
KevinFromTexas KevinFromTexas is offline
Meh
 
Join Date: Jul 2001
Location: Austin <------------> Birmingham?
Posts: 57,326
Cross posted from the Austin section - post from 12/18.

Quote:
Originally Posted by ivanwolf View Post
This week, forgot the days.



__________________
Conform or be cast out.
     
     
  #18  
Old Posted Aug 2, 2016, 11:38 PM
KevinFromTexas's Avatar
KevinFromTexas KevinFromTexas is offline
Meh
 
Join Date: Jul 2001
Location: Austin <------------> Birmingham?
Posts: 57,326
8/1







__________________
Conform or be cast out.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 10:57 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.