About The Ads  This week the ad company used in the forum will be monitoring activity and doing some tests to identify any problems which users may be experiencing. If at any time this week you get pop-ups, redirects, etc. as a result of ads please let us know by sending an email to forum@skyscraperpage.com or post in the ads complaint thread. Thank you for your participation.


Reply

 
Thread Tools Display Modes
     
     
  #41  
Old Posted Jun 21, 2019, 4:50 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam/Rainbow Lake
Posts: 34,370
An old friend of mine had geothermal heating at their house in Surrey, I think the whole street had it as all the houses were developed together.
__________________
belowitall
Reply With Quote
     
     
  #42  
Old Posted Jun 21, 2019, 4:51 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam/Rainbow Lake
Posts: 34,370
BC Hydro starts tunnel lining process for Site C diversion tunnels

SCOTT BROOKS
JUNE 20, 2019



The tunnel lining equipment (slip forms) prior to being moved into the tunnels at Site C. Source B.C. Hydro

FORT ST. JOHN, B.C. – B.C. Hydro has started the tunnel lining process this week on the first of two Site C diversion tunnels.

According to B.C. Hydro Community Relations Manager, David Conway, this part of the work is the last step in the construction of the diversion tunnels prior to river diversion in the Fall of 2020.

Conway says the tunnel lining process involves using a slip form where concrete is pumped through small openings located around the slip form, enabling it to cure in a perfect circle outside of the form.

...

https://www.energeticcity.ca/2019/06...vuAJ0-XslHkXQY
__________________
belowitall
Reply With Quote
     
     
  #43  
Old Posted Jul 11, 2019, 3:15 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam/Rainbow Lake
Posts: 34,370
BC Hydro adds 150 rooms to Site C work camp

Alaska Highway News
JULY 8, 2019



The work camp at Site C, which is being expanded by 150 rooms this month, July 8, 2019.
Photo By MATT PREPROST


The work camp at Site C is expanding.

The camp is expanding by 150 rooms this month, 90 of which were completed over the weekend, according to BC Hydro. The remaining 60 rooms will be completed later this month, and both will be on the camp’s existing footprint, the company said.

“With the contractor workforce expanding as work progresses on the project, we made the decision to expand the camp earlier this year,” spokesman David Conway said, adding the camp has reached maximum capacity at peak times during some weeks.

There were 3,775 employed on the project in April, the latest employment figures available for the project. Of those, just over 3,000 were employed as construction and non-construction contractors, roughly 600 of them local to the Peace River Regional District.

The camp was originally sized to house 1,600 workers, but designed for 2,100 if an expansion was required, as permitted through its environmental assessment certificate,Conway said.

BC Hydro is seeking an amendment its certificate to be able to expand to 2,200 rooms, Conway said.

...

https://www.alaskahighwaynews.ca/sit...P5yvyR5oelK3yQ
__________________
belowitall
Reply With Quote
     
     
  #44  
Old Posted Jul 11, 2019, 3:17 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam/Rainbow Lake
Posts: 34,370
Photo Gallery on Alaska Highway News
Site C Construction - May/June 2019

Alaska Highway News
JULY 5, 2019


https://www.alaskahighwaynews.ca/pho...fj8-ySWZ72cgrw
__________________
belowitall
Reply With Quote
     
     
  #45  
Old Posted Jul 24, 2019, 6:02 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam/Rainbow Lake
Posts: 34,370
Breakthrough at second Site C diversion tunnel

Alaska Highway News
JULY 12, 2019



Photo By BC HYDRO

BC Hydro says it broke through the second diversion tunnel needed to divert the Peace River ahead of building the earthfill dam at Site C.

The Crown utility said it reached the milestone on Thursday, July 11, after a year of excavations.

...

https://www.alaskahighwaynews.ca/sit...aoIBbDWWJRmx2k
__________________
belowitall
Reply With Quote
     
     
  #46  
Old Posted Aug 18, 2019, 4:57 PM
BobLoblawsLawBlog's Avatar
BobLoblawsLawBlog BobLoblawsLawBlog is offline
Registered User
 
Join Date: Feb 2016
Posts: 431
I'm happy the province is investing in renewable energy. Does anyone know where all the electricity generated will go? Will any of it go to Alberta?
Reply With Quote
     
     
  #47  
Old Posted Aug 18, 2019, 10:17 PM
Doug's Avatar
Doug Doug is offline
Registered User
 
Join Date: Jul 2001
Posts: 9,499
Quote:
Originally Posted by BobLoblawsLawBlog View Post
I'm happy the province is investing in renewable energy. Does anyone know where all the electricity generated will go? Will any of it go to Alberta?
Very little if any will go east. AB has limited intertie with BC despite having synchronized grids:
-1 small line through Elk Pass connecting the Fernie area with Kananaskis
-2 medium sized lines through Crowsnest that are constrained as they share capacity with the MT intertie and several wind farms.

AESO has a project to remove constraints on the Crowsnest interties. New paths would be challenging due to terrain and AB having protected virtually the entire eastern slope. Power from Site C would need to follow a circuitous route into AB. Building a line from the BC side of the Peace Country to the Wabamun hub west of Edmonton would likely cost several billion.

AB has a massive generation surplus that has driven prices ex distribution to record lows. It is unlikely to require new supply for a very long time. Even if demand were to materialize, hydro can't compete with gas fired generation as stranded gas in northern AB has driven prices down to essentially zero.
Reply With Quote
     
     
  #48  
Old Posted Sep 27, 2019, 8:09 PM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam/Rainbow Lake
Posts: 34,370
WorkSafeBC fines Site C Contractor $662,102

ADAM REABURN SEPTEMBER 21, 2019


A photo of the powerhouse at the Site C dam in the Spring of 2019 - B.C. Hydro

FORT ST. JOHN, B.C. – Peace River Hydro Partners, has been fined $662,102.48 by WorkSafeBC.

The fine was imposed on August 21, 2019, after a worker sustained an electrical shock injury. A worker was able to access the main circuit breaker in a high-voltage electrical cabinet for tunnelling equipment.

According to WorkSafeBC, the main electrical breaker extensions on the exterior cabinet door were not functioning, the de-energization switches had been circumvented and the main breaker switch-box isolation covers were in disrepair.

...

https://www.energeticcity.ca/2019/09...W-OBiKxBXkueMg
__________________
belowitall
Reply With Quote
     
     
  #49  
Old Posted Sep 27, 2019, 9:43 PM
Hardhatdan Hardhatdan is offline
Registered User
 
Join Date: Jan 2003
Posts: 3,774
Quote:
Originally Posted by Doug View Post
Very little if any will go east. AB has limited intertie with BC despite having synchronized grids:
-1 small line through Elk Pass connecting the Fernie area with Kananaskis
-2 medium sized lines through Crowsnest that are constrained as they share capacity with the MT intertie and several wind farms.

AESO has a project to remove constraints on the Crowsnest interties. New paths would be challenging due to terrain and AB having protected virtually the entire eastern slope. Power from Site C would need to follow a circuitous route into AB. Building a line from the BC side of the Peace Country to the Wabamun hub west of Edmonton would likely cost several billion.

AB has a massive generation surplus that has driven prices ex distribution to record lows. It is unlikely to require new supply for a very long time. Even if demand were to materialize, hydro can't compete with gas fired generation as stranded gas in northern AB has driven prices down to essentially zero.
If there's a massive generation surplus why is there a 250MW plant under construction and a 1000MW one planned to start next spring?
Reply With Quote
     
     
  #50  
Old Posted Nov 13, 2019, 4:18 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam/Rainbow Lake
Posts: 34,370
Site C Construction Schedule for November 11th to the 24th, 2019

TRACY TEVES
NOVEMBER 12, 2019




https://www.energeticcity.ca/2019/11...z5r6Vu58Trv3j8
__________________
belowitall
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 11:17 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2019, vBulletin Solutions, Inc.