HomeDiagramsDatabaseMapsForum
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan

About The Ads  This week the ad company used in the forum will be monitoring activity and doing some tests to identify any problems which users may be experiencing. If at any time this week you get pop-ups, redirects, etc. as a result of ads please let us know by sending an email to forum@skyscraperpage.com or post in the ads complaint thread. Thank you for your participation.


Reply

 
Thread Tools Display Modes
     
     
  #61  
Old Posted Sep 13, 2019, 5:26 PM
prairieguy prairieguy is offline
Registered User
 
Join Date: Apr 2007
Posts: 1,162
It is no surprise that almost all of the river facing units (including the multi million dollar ones) are sold. It seems the ground floor 2 story "townhouse" units are the ones that are the most challenge to sell at this point.

I understand why the riverview units sold first, but have to say a view of the beautiful Nutana/Varsity View neighborhoods would not be so bad either.
Reply With Quote
     
     
  #62  
Old Posted Sep 21, 2019, 2:41 PM
alt_center alt_center is offline
Registered User
 
Join Date: Aug 2017
Location: Saskatoon
Posts: 230
It looks like all the below grade concrete work is complete and they are preparing to pour the at grade slab. Back-filling continues around the base.

I noticed extensive use of cables for prestressing the concrete in all the horizontal slabs.

In the foreground can be seen pipes for what I assume is a snow/ice melting system in the parkade entry ramp.


Reply With Quote
     
     
  #63  
Old Posted Sep 25, 2019, 6:31 PM
alt_center alt_center is offline
Registered User
 
Join Date: Aug 2017
Location: Saskatoon
Posts: 230
Still prepping for the ground floor slab. It looks like there will be radiant in-floor heating. With rebar, electrical conduit, stressing cables, plumbing and other pass-thrus, and heating pipes, there is a lot of "stuff" in the slab.

Reply With Quote
     
     
  #64  
Old Posted Oct 3, 2019, 1:45 AM
alt_center alt_center is offline
Registered User
 
Join Date: Aug 2017
Location: Saskatoon
Posts: 230
They poured most of the at-grade slab yesterday. But, there seems to be a small section on the SE side (along University Drive) that is not done. Its not even formed yet... I can't think of the reason why they did that (its also hard to get a really good look at things).

Today they formed and poured a few columns on the new slab.



Reply With Quote
     
     
  #65  
Old Posted Oct 3, 2019, 3:40 PM
YXE YXE is offline
Registered User
 
Join Date: Jun 2017
Posts: 116
Definitely a slower moving project than the others we’ve seen recently. How’s Baydo on Broadway looking these days?
Reply With Quote
     
     
  #66  
Old Posted Oct 4, 2019, 2:06 AM
mitchellk12's Avatar
mitchellk12 mitchellk12 is offline
Moderator
 
Join Date: Sep 2015
Location: Saskatoon, SK
Posts: 601
Quote:
Originally Posted by YXE View Post
Definitely a slower moving project than the others we’ve seen recently. How’s Baydo on Broadway looking these days?
I biked past there last week and looks like within the next few weeks to a month should see a crane up. Its 2 levels underground right? Looks like they are there to me or close
Reply With Quote
     
     
  #67  
Old Posted Oct 12, 2019, 12:35 AM
alt_center alt_center is offline
Registered User
 
Join Date: Aug 2017
Location: Saskatoon
Posts: 230
Second floor poured.

Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 8:51 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2019, vBulletin Solutions, Inc.