Quote:
Originally Posted by Zapatan
Three and a half years for the first tower, WTF
|
Its gonna take a long time for this entire project to be completed.
Apparently, alderman Reilly said that there's gonna be a wait between the two-towers for a study to be done to determine the impact the first tower had on traffic before putting up the second building. so if things don't go very well traffic-wise, then we could see changes for the second tower better or worse.
So really, this project including dusable park won't be done until at least
2029 without changes to the current proposal.
This is if everything goes to plan:
2021-Break Ground on first tower
2024-First tower completed
2024/2025-Traffic Study
2025-Traffic Study Review
2025/2026-Second Tower Breaks ground without any changes
2029/2030-Second Tower completed along with dusable park