Quote:
Originally Posted by austlar1
I suspect the master plan will attempt to relate to all of these elements in a truly urban manner.
|
What master plan? This is a simple upzoning, not a PUD. The only regulating plan is the existing east riverside corridor plan.
Which is good and all, but we don't have to guess about it. We know exactly what is required.
(as a side, I'll correct myself and say that the ERC corridor plan does require some new street dedications in these parcels, so yes that should be nice).
Quote:
Originally Posted by austlar1
Also, if it happens, Catylist will probably be built out by a variety of different developers over a decade or two.
|
A decade or two? It's not big enough to require that much time.
In actual buildable area (remember a big chunk is undevelopable/isn't being developed), this is only slightly larger than Phase 1 of the Domain (if possibly slightly taller).
Don't get me wrong, it's a nice medium-sized project, but you're blowing it up to be something much larger than it is.