Quote:
Originally Posted by Fvn
By the looks of it a work platform (Idk what else it could be) has been installed on the 2 south and the 1 north external shearwalls, cladding will come soon!
|
That is exactly what they are. They are essentially the same systems as the platforms climbing ahead to form / pour the shearwalls, reusing the same anchor points. Except instead of working on the forms from the top platform, the window installer will work from the lowest trailing level installing the glass.