HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Texas & Southcentral > San Antonio


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #1  
Old Posted Mar 29, 2007, 8:44 PM
sakyle04's Avatar
sakyle04 sakyle04 is offline
COGSADCAJA, VP and CGO
 
Join Date: Aug 2006
Location: Frozen Swamps of Ohio
Posts: 1,369
Vidorra Construction Update

From the latest Vidorra email newsletter...

CONSTRUCTION UPDATE

Foundation work is getting underway. Over the next few weeks, we will see excavation of the sub-strata under the floor slab and the replacement of the dirt removed with low plasticity sand and gravel fill. Immediately thereafter, the contractor will begin to drill and place concrete piers to a depth of approximately 70 feet.

The next step will be to pour reinforced concrete pier caps on top of which the slab on grade will be poured. The construction crane will go up in June.

The Historic Design and Review Commission has given final approval to the Vidorra plans. The foundation permit has been approved and signed by the city. All other permits will follow during the course of construction.
__________________
PAVE PARADISE, PUT UP A (HIGH-RISE ON A) PARKING LOT...
Kyle on Twitter
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > United States > Texas & Southcentral > San Antonio
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 9:37 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.