  #801  
Old Posted Sep 25, 2023, 11:58 AM
Tcmetro Tcmetro is offline
Registered User
 
Join Date: Jul 2010
Posts: 105
Milwaukee's lakefront streetcar line (L Line) is opening on October 29th. It won't stop at the transit center located under the Couture tower until construction is complete there.

https://biztimes.com/milwaukee-stree...vice-on-oct-29
Reply With Quote
     
     
  #802  
Old Posted Oct 31, 2023, 7:23 PM
PanhandleBledsoe PanhandleBledsoe is offline
Registered User
 
Join Date: Apr 2023
Location: Tallahassee FL
Posts: 10
Quote:
Originally Posted by Tcmetro View Post
Milwaukee's lakefront streetcar line (L Line) is opening on October 29th. It won't stop at the transit center located under the Couture tower until construction is complete there.

https://biztimes.com/milwaukee-stree...vice-on-oct-29
I can't figure out how to link or embed a video properly so I removed that broken window, but here's the Youtube URL. Video of the L-line in operation:

https://www.youtube.com/watch?v=KPy3...NYTrainzchaser
Reply With Quote
     
     
  #803  
Old Posted Nov 7, 2023, 2:56 AM
hipster duck's Avatar
hipster duck hipster duck is offline
Registered User
 
Join Date: Oct 2014
Location: Toronto
Posts: 4,111
In Canada, phase 1 of Edmonton's Valley LRT line (the SE segment) opened the other day.

This first phase is 13 km (8 miles) long, not 40 km (25 miles) as written in the OP.

Video Link
Reply With Quote
     
     
  #804  
Old Posted Nov 7, 2023, 5:20 PM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 11,872
Edmonton's Valley Line opened on November 4th, to be exact.
Reply With Quote
     
     
  #805  
Old Posted Nov 10, 2023, 4:24 AM
Cirrus's Avatar
Cirrus Cirrus is offline
cities|transit|croissants
 
Join Date: Jul 2001
Location: Washington, DC
Posts: 18,384
Updated the master list to reflect
  • Tacoma Link streetcar moved to complete
  • Orlando Brightline intercity extension moved to complete
  • Milwaukee streetcar Lakefront branch moved to complete
  • Edmonton Valley light rail phase 1 moved to complete. Phase 2 remains on the construction list.
Thanks for the updates. Keep them coming as they happen!
__________________
writing | twitter | flickr | instagram | ssp photo threads
Reply With Quote
     
     
  #806  
Old Posted Nov 10, 2023, 4:09 PM
Easy's Avatar
Easy Easy is offline
Registered User
 
Join Date: Dec 2004
Location: Los Angeles, CA
Posts: 1,578
Quote:
Originally Posted by Cirrus View Post
Moved 6 miles of the LA Crenshaw line to complete. 2 miles remain u/c.
Great list! Thanks for keeping it up for so many years!

Technically the Crenshaw/K line was fully completed in its entirety and accepted by metro back in 2022. The southern part has never opened due to the construction of an infill station to connect to the LAX people mover that began immediately (maybe the next day) after the line was completed. I guess they can be considered one project but there's nothing under construction except the infill station. The completed tracks and station south of that have been untouched and unused since 2022.
Reply With Quote
     
     
  #807  
Old Posted Nov 10, 2023, 11:05 PM
Cirrus's Avatar
Cirrus Cirrus is offline
cities|transit|croissants
 
Join Date: Jul 2001
Location: Washington, DC
Posts: 18,384
Thanks for the update! So let me make sure I understand. Please confirm this is correct, or clarify what I got wrong: The "Crenshaw line" opened in 2022, but there is still a 2-mile section yet to open that will connect to the airport people mover. On this section, the tracks are done, but the connecting station is not yet done. Yes?

Assuming that's correct, I've changed the project title on the front page from "Los Angeles Crenshaw extension section two" to "Los Angeles Crenshaw line airport extension." However, the "airport extension" will remain listed as a 2-mile under construction project, because those 2 miles do not yet carry passengers. Every project has some components that finish sooner than others, but what qualifies as "no longer under construction" for the purposes of this list is when it's open to passengers.
__________________
writing | twitter | flickr | instagram | ssp photo threads
Reply With Quote
     
     
  #808  
Old Posted Nov 15, 2023, 8:40 PM
scalziand's Avatar
scalziand scalziand is offline
Mortaaaaaaaaar!
 
Join Date: Aug 2007
Location: Naugatuck, CT/Worcester,MA
Posts: 3,506
Quote:
Originally Posted by 1Boston View Post
Not sure why this isn't included but MBTA's South Coast Rail Project (extending to south coast cities of New Bedford and Fall River) is under construction. https://www.mbta.com/projects/south-coast-rail
Just noticed that Phase I of Boston South Coast Rail -37 miles is still missing from the list.
Reply With Quote
     
     
  #809  
Old Posted Nov 18, 2023, 2:27 AM
Cirrus's Avatar
Cirrus Cirrus is offline
cities|transit|croissants
 
Join Date: Jul 2001
Location: Washington, DC
Posts: 18,384
Thanks. I've edited the list to include it.
__________________
writing | twitter | flickr | instagram | ssp photo threads
Reply With Quote
     
     
  #810  
Old Posted Dec 18, 2023, 12:48 AM
Nite's Avatar
Nite Nite is online now
Registered User
 
Join Date: Dec 2007
Location: Toronto
Posts: 2,992
Update video on all Canadian transit projects:

Video Link
Reply With Quote
     
     
  #811  
Old Posted Dec 28, 2023, 10:52 PM
Tcmetro Tcmetro is offline
Registered User
 
Join Date: Jul 2010
Posts: 105
A couple changes for the front page list:
- KC Streetcar Main St extension is well underway and opening in 2025. 3.5 miles in length.
https://kcstreetcar.org/about-street...eet-extension/

- Dallas Silver Line commuter rail is under construction. 26 miles and opening in 2025 or 2026.
https://www.dart.org/about/plans-pro...r-line-project

- LIRR East Side Access in New York opened 1/25/2023.
Reply With Quote
     
     
  #812  
Old Posted Jan 27, 2024, 9:37 PM
muertecaza muertecaza is offline
Registered User
 
Join Date: Oct 2015
Posts: 2,235
Phoenix NW extension opened today and can be moved to complete.

https://www.valleymetro.org/project/...ase-ii/opening
Reply With Quote
     
     
  #813  
Old Posted Jan 27, 2024, 10:34 PM
llamaorama llamaorama is offline
Unicorn Wizard!
 
Join Date: Oct 2008
Posts: 4,212
The DART Silver Line feels like it's been under construction forever. Some parts of it look like they are nearly done and the actual trains are already delivered, but then there are other parts that look like they only recently got started building.

Wish they'd maybe get a move on and hurry it up.

At least its not as bad as the DC Purple Line Project.
Reply With Quote
     
     
  #814  
Old Posted Feb 2, 2024, 4:52 AM
Cirrus's Avatar
Cirrus Cirrus is offline
cities|transit|croissants
 
Join Date: Jul 2001
Location: Washington, DC
Posts: 18,384
Updated the front page to reflect
  • KC Streetcar Main St extension
  • Dallas Silver Line
  • LIRR ESA (duh Cirrus, I've ridden that)
  • Phoenix NW ext
Congrats Phoenix on the first opening of 2024
__________________
writing | twitter | flickr | instagram | ssp photo threads
Reply With Quote
     
     
  #815  
Old Posted Apr 12, 2024, 8:17 PM
202_Cyclist's Avatar
202_Cyclist 202_Cyclist is offline
Registered User
 
Join Date: Feb 2009
Posts: 5,945
Milwaukee's streetcar extension opened yesterday.

https://thehopmke.com/l-line/
Reply With Quote
     
     
  #816  
Old Posted Apr 12, 2024, 8:25 PM
mhays mhays is offline
Never Dell
 
Join Date: Jul 2001
Posts: 19,804
Seattle's Sound Transit has two Link openings planned this year:

East Link (Two Line) will open a starter line April 27. This is only from South Bellevue to Redmond Tech Station. The Seattle connection needs some rework and will open next year. An extension to Downtown Redmond was always going to be next year. The Seattle extension will also use the existing One Line rails northward through town, improving frequency.

Lynnwood (the latest One Line extension to the north, with another planned) will open August 30.

Federal Way (the latest One Line south extension, with another planned) will open in 2026.

We're still trying to figure out the alignment and stations for the Ballard and West Seattle lines, with further study before the final EIS because leadership keeps thinking of new ideas and cost estimates have risen.

https://www.soundtransit.org/system-expansion
Reply With Quote
     
     
  #817  
Old Posted Apr 22, 2024, 9:23 PM
DetroitMan DetroitMan is offline
Detroiter4life
 
Join Date: Jul 2001
Location: Back home in Georgia!
Posts: 4,061
After long funding struggle, MetroLink extension to MidAmerica airport moves forward

Quote:
While a potential MetroLink expansion in St. Louis stirs controversy, work has been quietly underway for more than a year on building a long-sought Metro East extension of the light rail line.

Illinois state funds are paying the entire cost of the $98 million, 5.2-mile connection from MetroLink’s current easternmost outpost — the Shiloh-Scott station near Scott Air Force Base — to MidAmerica St. Louis Airport in Mascoutah.

Excavation, embankment and bridge work along the route will be substantially completed by August, said Ken Sharkey, managing director of the St. Clair County Transit District, which is in charge of the project.

Other construction will follow, and the extension and the new MetroLink station at the airport are expected to open in 2026.

St. Clair County officials had pushed on and off since the 1990s to get funding for the extension to MidAmerica, which for many years was attacked as a boondoggle because of its lack of flights. Finally, in 2019, Illinois Gov. J.B. Pritzker included the light rail connection in the mammoth $45 billion Rebuild Illinois capital improvements plan passed by the state Legislature.

County Board Chairman Mark Kern said in addition to getting people to and from the county-owned airport and nearby businesses — and acting as a spur to additional development — the extension will help the overall MetroLink system.

“It’s an important thing for the region,” Kern said. “The more riders we get on MetroLink, the more successful it is.”
Expanding routes
Kern said that’s why he supported St. Louis’ push to get the East-West Gateway Council of Governments to endorse a revised plan to build a new MetroLink line connecting the city’s north and south sides. The council includes the metro area’s top elected officials. In February, that far more expensive project, currently estimated at $1.1 billion, was endorsed by the council in February after a move to table the discussion fell just short.

Critics, with St. Charles County Executive Steve Ehlmann at the forefront, questioned planners’ projections of more than 5,000 daily boardings.

The libertarian Show-Me Institute also has attacked the St. Louis route, which would run along Jefferson Avenue from Chippewa Street to the new National Geospatial-Intelligence Agency facility, then go west along Natural Bridge Avenue to North Grand Boulevard.

Current projections call for the St. Louis project to require $659 million in federal aid. The city and the Bi-State Development Agency, which oversees Metro Transit and MetroLink, expect to submit an application later this year.Taulby Roach, Bi-State’s CEO, said no ridership projections for the Illinois extension were required to qualify for the Illinois grant. He said the strategy also was made possible by the fact that St. Clair County already owned all the land being used. Bi-State did issue ridership estimates for the Illinois extension in the late 1990s when local officials made an unsuccessful try for federal funding. A U.S. Department of Transportation report in 1999 questioned whether they were too low to justify the expense.

Now, 25 years later, county officials say MidAmerica Airport has been on an upswing.

Airport Director Darren James says Allegiant Air, the facility’s lone passenger carrier, will have around 70 inbound and outbound flights a week involving 12 destinations during peak traffic times this summer. The newest destination — Knoxville, Tennessee — will be added in June.

A year ago the airport almost doubled the size of its terminal, part of a $34 million project that also includes soon-to-be-completed renovations.

Kern also cited Boeing’s construction of a new drone plant at MidAmerica, adding to its parts facility already there. “Then we expect suppliers to Boeing are going to co-locate there,” he said. “We have reserved acreage for adjoining businesses, pretty much at the terminus for MetroLink.”

Kern said the new connection will allow people to take MetroLink all the way from MidAmerica to St. Louis Lambert International Airport.

An additional $70 million or so in ancillary work also is involved, including a 5-mile bike and pedestrian trail alongside the MetroLink extension, a new 2.4-mile frontage road near the extension and Interstate 64 and a new stretch of Rieder Road.
https://www.stltoday.com/news/local/...b4a265e86.html
Reply With Quote
     
     
  #818  
Old Posted Apr 23, 2024, 1:21 AM
Cirrus's Avatar
Cirrus Cirrus is offline
cities|transit|croissants
 
Join Date: Jul 2001
Location: Washington, DC
Posts: 18,384
Saint Louis is dying for a north-south line. That's a serious no-brainer.

But Mid-America Aiport is... extremely questionable to say the least. Who's going to pay for Metrolink to operate that?
__________________
writing | twitter | flickr | instagram | ssp photo threads
Reply With Quote
     
     
  #819  
Old Posted Apr 23, 2024, 2:04 AM
DetroitMan DetroitMan is offline
Detroiter4life
 
Join Date: Jul 2001
Location: Back home in Georgia!
Posts: 4,061
Quote:
Originally Posted by Cirrus View Post
Saint Louis is dying for a north-south line. That's a serious no-brainer.

But MidAmerica Airport is... extremely questionable to say the least. Who's going to pay for Metrolink to operate that?
The State of Illinois is funding the entire project. While I agree a north-south line is very much needed in STL, time will tell if this extension to MidAmerica pays off.
Reply With Quote
     
     
  #820  
Old Posted Apr 23, 2024, 4:23 AM
Doady's Avatar
Doady Doady is offline
Registered User
 
Join Date: Apr 2004
Posts: 4,746
Milwaukee has been cutting bus service for over a decade to build a streetcar. So sad.

‘There is nowhere else to cut’: 16 Milwaukee bus routes could be eliminated by 2025

Milwaukee Transit in Crisis, Faces Massive Cuts


Ridership in 2011: 45,656,600
Ridership in 2019: 26,960,800

19 million riders lost, a 41% decline in only a 8-year span. But congratulations on your new streetcar, Milwaukee!
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 9:01 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.