HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations


Reply

 
Thread Tools Display Modes
     
     
  #19541  
Old Posted Feb 24, 2023, 1:36 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Quote:
Originally Posted by BlueDot View Post
With the River District taking up so much space in that area, I wonder if the owners of Mardi Gras World will consider moving ?
I had discussed this earlier when the new TopGolf was announced and thought moving mardi gras world to where drive shack was going might be a good move for everyone because I dont think a float den right on the river is the best use of the property right there. So definitely agree they should consider moving. But its ultimately up to them since they own the property and the Port own the old terminal casino building next door.
Reply With Quote
     
     
  #19542  
Old Posted Feb 24, 2023, 3:32 PM
frquarterguy frquarterguy is offline
Registered User
 
Join Date: Sep 2010
Posts: 9
Quote:
Originally Posted by tennis1400 View Post
I had discussed this earlier when the new TopGolf was announced and thought moving mardi gras world to where drive shack was going might be a good move for everyone because I dont think a float den right on the river is the best use of the property right there. So definitely agree they should consider moving. But its ultimately up to them since they own the property and the Port own the old terminal casino building next door.
Just FYI, Mardi Gras World does not own the property they use as a float den. Its complicated, but they also lease that property from the Port.
Reply With Quote
     
     
  #19543  
Old Posted Feb 24, 2023, 4:28 PM
socigradstudent socigradstudent is offline
Registered User
 
Join Date: Mar 2016
Location: New Orleans
Posts: 180
What's the restaurant going in at Chartres and Iberville?

Also--do we know if Boulevard still plans on opening a F.Q. location?
Reply With Quote
     
     
  #19544  
Old Posted Feb 24, 2023, 5:09 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Quote:
Originally Posted by frquarterguy View Post
Just FYI, Mardi Gras World does not own the property they use as a float den. Its complicated, but they also lease that property from the Port.
I thought that was the case too but the assessors site shows them as the owner now? has something changed?


Probably for developers sake best if all owned by the port









Reply With Quote
     
     
  #19545  
Old Posted Feb 24, 2023, 5:13 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Quote:
Originally Posted by socigradstudent View Post
What's the restaurant going in at Chartres and Iberville?

Also--do we know if Boulevard still plans on opening a F.Q. location?


Doesn't say the name of the restaurant just a placeholder ... I'm sure boulevard will go there. .. creole cuisine concepts has been expanding like crazy.

I actually think they will do well there especially for people looking for something less traditional nola.



Also, as a general observation. The quarter is exploding with new restaurants reopening; some in vacant spots, or reopening or new concepts. its good to see the rebound from covid. I count about 25 venues in quarter since the beginningof the year opening or coming soon
Reply With Quote
     
     
  #19546  
Old Posted Feb 24, 2023, 6:34 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Good Article on the Old Whitney Bank Buildings


Developer Mike Wampold selling three CBD office buildings, part of former Whitney Bank complex







https://www.nola.com/news/business/f...2a3d5674d.html
Reply With Quote
     
     
  #19547  
Old Posted Feb 27, 2023, 5:28 PM
frquarterguy frquarterguy is offline
Registered User
 
Join Date: Sep 2010
Posts: 9
[QUOTE=tennis1400;9875027]I thought that was the case too but the assessors site shows them as the owner now? has something changed?


Probably for developers sake best if all owned by the port"


Nothing has changed -- The tax assessor's website is incorrect. Hopefully at some point it will get corrected.
Reply With Quote
     
     
  #19548  
Old Posted Feb 27, 2023, 8:01 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
[QUOTE=frquarterguy;9877206]
Quote:
Originally Posted by tennis1400 View Post
I thought that was the case too but the assessors site shows them as the owner now? has something changed?


Probably for developers sake best if all owned by the port"


Nothing has changed -- The tax assessor's website is incorrect. Hopefully at some point it will get corrected.
hhahaah I wouldnt hold your breath... but glad to see its all owned by the port. do you happen to know the duration of Mardi Gras Worlds lease of the property?
Reply With Quote
     
     
  #19549  
Old Posted Feb 27, 2023, 8:11 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
22-311535
4243 VETERANS MEMORIAL BLVD, METAIRIE 70006
SUBURBAN VILLAS
02/07/2023
East Bank
Commercial Tenant Buildout
$387,549.79
District 5
1
CAVA Mezze Grill, LLC
Naikwan Cheung
702 H St. NW, 2nd floor
Washington, DC 20001
EMBREE CONSTRUCTION GROUP, INC.
4747 Williams Drive
Georgetown, TX 78633




22-312300
2840 VETERANS MEMORIAL BLVD, METAIRIE 70002
EAGLE PARK
02/06/2023
East Bank
Commercial Demolition
$130,000.00
District 5
2
Property Manager Stirling Properties
Brendan Jacob
601 Poydras Street, Suite 2755
New Orleans, LA 70130
R.K. Hoover Commercial Contracting, Inc.
108 N Medina Street
San Antonio, TX 78207







22-312658
3301 VETERANS MEMORIAL BLVD, METAIRIE 70002
SHREWSBURY
01/26/2023
East Bank
Commercial Tenant Buildout
$315,425.00
District 5
1
Lakeside Shopping Center
3301 Veterans Memorial Blvd 209
Metairie, LA 70002
MANAGEMENT RESOURCE SYSTEMS, INC.
1907 Baker Road
High Point, NC 27263













4040 Canal St·Design Review · Project #23-0228 · Ref Code:WZKP64
View Download (2) Print Summary Submit Add to Watch List
Type:
Design Review
Applicant:
CSC Investments LLC
Status:
Application Submitted
Date Filed:
2/14/2023
Closed:
No
Description:
Design review for proposed new construction of The project is a new 2-story commercial building with uses that include a specialty restaurant and office space at the ground level with office space on the 2nd floor. Design review is required because the property is located in the Enhancement Corridor Design Overlay District and is listed as a proviso in the approved zoning variance BZA Docket 058-22.





36-16038 Alcohol: Class A - Restaurant Beer and Liquor 2501 BAR AND GRILL, LLC 2501 BAR AND GRILL
2501 CANAL ST
NEW ORLEANS LA 70119-6407 Temporary Feb 24, 2023










Reply With Quote
     
     
  #19550  
Old Posted Feb 28, 2023, 11:50 AM
BlueDot's Avatar
BlueDot BlueDot is offline
Registered User
 
Join Date: Feb 2023
Posts: 212
Quote:
Originally Posted by tennis1400 View Post
22-311535
4243 VETERANS MEMORIAL BLVD, METAIRIE 70006
SUBURBAN VILLAS
02/07/2023
East Bank
Commercial Tenant Buildout
$387,549.79
District 5
1
CAVA Mezze Grill, LLC
Naikwan Cheung
702 H St. NW, 2nd floor
Washington, DC 20001
EMBREE CONSTRUCTION GROUP, INC.
4747 Williams Drive
Georgetown, TX 78633




22-312300
2840 VETERANS MEMORIAL BLVD, METAIRIE 70002
EAGLE PARK
02/06/2023
East Bank
Commercial Demolition
$130,000.00
District 5
2
Property Manager Stirling Properties
Brendan Jacob
601 Poydras Street, Suite 2755
New Orleans, LA 70130
R.K. Hoover Commercial Contracting, Inc.
108 N Medina Street
San Antonio, TX 78207







22-312658
3301 VETERANS MEMORIAL BLVD, METAIRIE 70002
SHREWSBURY
01/26/2023
East Bank
Commercial Tenant Buildout
$315,425.00
District 5
1
Lakeside Shopping Center
3301 Veterans Memorial Blvd 209
Metairie, LA 70002
MANAGEMENT RESOURCE SYSTEMS, INC.
1907 Baker Road
High Point, NC 27263













4040 Canal St·Design Review · Project #23-0228 · Ref Code:WZKP64
View Download (2) Print Summary Submit Add to Watch List
Type:
Design Review
Applicant:
CSC Investments LLC
Status:
Application Submitted
Date Filed:
2/14/2023
Closed:
No
Description:
Design review for proposed new construction of The project is a new 2-story commercial building with uses that include a specialty restaurant and office space at the ground level with office space on the 2nd floor. Design review is required because the property is located in the Enhancement Corridor Design Overlay District and is listed as a proviso in the approved zoning variance BZA Docket 058-22.





36-16038 Alcohol: Class A - Restaurant Beer and Liquor 2501 BAR AND GRILL, LLC 2501 BAR AND GRILL
2501 CANAL ST
NEW ORLEANS LA 70119-6407 Temporary Feb 24, 2023










Wow.. do you have more of those articles ?
Reply With Quote
     
     
  #19551  
Old Posted Feb 28, 2023, 4:58 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
329 N Diamond St (Ref. Code: MRD1X6)
HDLC Certificate of Appropriateness
Description
Enclosure following the partial demolition of an existing warehouse building.
Issue Date: Feb 24 2023 3:36PM







239-241 Bourbon St·Interior Demolition · Ref Code:LLL2YK
Print Summary Submit Add to Watch List
Type:
Interior Demolition
Applicant:
John C Williams
Status:
Application Submitted
Date Filed:
2/23/2023
Closed:
No
Description:
The permit is to renovate 239-241 Bourbon st, which will require interior demolition of walls, floors, finishes on level 1, 2, and 3. Level one will maintain as a bar with Kitchen. Level 2 will maintain as a lounge space with Kitchenette. Level 3 will be converted to a str consisting of 5 keys Interior demo only. No use or occupanct. Renovation requires separate permit.





Current Crop Roasting Shop to Open on Magazine


https://www.bizneworleans.com/curren...n-on-magazine/






837 Camp St·New Construction · Ref Code:WMVN4V
Print Summary Submit Add to Watch List
Type:
New Construction
Applicant:
Kirk Fabacher
Status:
VOIDED - Duplicate Permit
Date Filed:
2/15/2023
Closed:
Yes
Description:
PHASE 1 OF DEVELOPMENT TO INCLUDE NEW 6-STORY MIX-USE STRUCTURE CONSISTING OF 3 FLOORS OF VEHICULAR PARKING, 2 FLOORS OF ALL-SUITE HOTEL, 1 FLOOR FOR FUTURE RESTAURANT TENANT. PHASE 2, RESTAURANT TENANT BUILD-OUT TO BE PERMITTED SEPARATELY. PHASE 3, RENOVATION OF THE FORMER OZANAM INN TO A BOUTIQUE HOTEL TO BE PERMITTED SEPARATELY.





Senior Living Community Debuts in Former Carrollton Courthouse




Attendees were encouraged to take self-guided tours of the community’s common areas, including La Colonnade Dining Room, Ben Franklin Bar & Bistro, libraries, a fitness suite, a meditation room, a theater, arts and arts crafts centers and more. They could also view areas decorated with original works by local artists, curated by the New Orleans Arts Council.

Residents will start moving into their new homes within the next couple of weeks.

https://www.bizneworleans.com/senior...on-courthouse/
Reply With Quote
     
     
  #19552  
Old Posted Mar 2, 2023, 7:53 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Biden Announces $500,000 Grant for Claiborne Project



https://www.bizneworleans.com/biden-...borne-project/





Expansion at NASA’s Michoud Assembly Facility Campus



https://www.bizneworleans.com/expans...cility-campus/



Port SL Opens Doors to New Riverfront Headquarters




https://www.bizneworleans.com/port-s...ign=newsletter
Reply With Quote
     
     
  #19553  
Old Posted Mar 5, 2023, 4:07 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
5024 Pontchartrain Blvd·Renovation (Non-Structural) · Ref Code:N1X7RD
View Print Summary Submit Add to Watch List
Type:
Renovation (Non-Structural)
Applicant:
Seth Board
Status:
Application Submitted
Date Filed:
2/28/2023
Closed:
No
Description:
Interior Renovations to Private Club


























930-940 Chartres St·Interior Demolition · Ref Code:NU61E1
View Print Summary Submit Add to Watch List
Type:
Interior Demolition
Applicant:
Duvernay Leo
Status:
Zoning Review
Date Filed:
3/1/2023
Closed:
No
Description:
Interior Demolition. Disconnect all plumbing fixtures. Remove all interior millwork. Remove all drywall from walls and ceilings. Remove all non load bearing interior stud walls. Haul away all debris. No use or occupancy. Renovation requires separate permit





4118-4132 S Carrollton Ave, 4036-4052 Ulloa St, 4041-4051 Tulane Ave·NPP Notifications · Project #23-0301 · Ref Code:GBVUCA
View Print Summary Submit Add to Watch List
Type:
NPP Notifications
Applicant:
C Dematteo LLC
Status:
Draft Application
Date Filed:
3/3/2023
Closed:
No
Description:
Conditional Use A conditional use to permit a car wash in an MU-1 Medium Intensity Mixed-Use District and an HUC Historic Urban Corridor Use Restriction Overlay District in accordance with Table 15-1 and Section 18.5.B of the Comprehensive Zoning Ordinance. This request must be heard by the City Planning Commission and City Council at public meetings.








235 Bourbon St, 237 bourbon·Interior Demolition · Ref CodeXH03W
View Print Summary Submit Add to Watch List
Type:
Interior Demolition
Applicant:
John C Williams
Status:
Application Submitted
Date Filed:
3/2/2023
Closed:
No
Description:
The permit is to renovate 235-237, 239-241 Bourbon st, which will require interior demolition of walls, floors, finishes on level 1, 2, and 3. Level one will maintain as a bar with Kitchen. Level 2 will maintain as a lounge space with Kitchenette. Level 3 will be converted to a str consisting of 5 keys Interior demo only. No use & occupancy. No exterior work allowed. Renovation requires a separate permit.





623 Frenchmen St·Renovation (Structural) · Ref Code:BP2LHH
View Print Summary Submit Remove from Watch List
Type:
Renovation (Structural)
Applicant:
Kirk Fabacher
Status:
Application Submitted
Date Filed:
3/3/2023
Closed:
No
Description:
RENOVATION AND ADDITION TO EXISTING MUSIC CLUB





438 Canal St·Renovation (Non-Structural) · Ref Code:J1SFQ5
View Print Summary Submit Add to Watch List
Type:
Renovation (Non-Structural)
Applicant:
Heather Cooper
Status:
Application Submitted
Date Filed:
3/3/2023
Closed:
No
Description:
Renovation of an existing tenant space. New exterior doors and cladding.

Reply With Quote
     
     
  #19554  
Old Posted Mar 5, 2023, 4:10 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
329 N Diamond St (Ref. Code: MRD1X6)
CBD HDLC Architectural Review Committee
Description
Renovation of existing Non-Contributing rated two-story warehouse building for conversion to hotel use.
Hearing Date: Mar 14 2023 9:30AM

















Reply With Quote
     
     
  #19555  
Old Posted Mar 5, 2023, 8:33 PM
sguil1 sguil1 is offline
Registered User
 
Join Date: Jan 2009
Posts: 661
Design set to begin for new Crescent City Connection lighting

http://wwwapps.dotd.la.gov/administr...aspx?key=32268

The Louisiana Department of Transportation and Development (DOTD) announces a tasking to Modjeski and Masters, Inc. (M&M) to design a new decorative lighting system for the Crescent City Connection bridges in New Orleans. The design is for controllable and programmable LED lights on the trusses of the bridges, along with lights illuminating the piers. The contract includes, but is not limited to, plans, specifications and special provisions, construction estimates, illumination analysis, and engineering calculations for replacement of the existing decorative lighting system.

“As a child, I watched the construction of the second span of the Crescent City Connection bridge, an iconic symbol of New Orleans that has lost its ability to reflect against the night sky,” said DOTD Secretary Shawn D. Wilson, Ph.D. “As one of my last actions as secretary, I am proud to initiate new LED technology that will allow us to showcase the bridge like never before, while at the same time moving to a technology that uses a fraction of the energy to run. Equally important, working with New Orleans & Company and the convention and tourism industry, we are introducing a new model of sustainable operations.”

The design phase is the fifth of six parts of a standard DOTD project. The final phase, construction, is scheduled to be let later this year and completed by the end of 2024. DOTD estimates the construction phase to cost $16.5 million.

Reply With Quote
     
     
  #19556  
Old Posted Mar 7, 2023, 4:14 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
4227 Magazine St·New Construction · Ref Code:107TGR
View Print Summary Submit Remove from Watch List
Type:
New Construction
Applicant:
Studio WTA
Status:
Application Submitted
Date Filed:
3/6/2023
Closed:
No
Description:
New construction of wood & steel-framed 3-story mixed-use building consisting of a commercial restaurant/performance kitchen space in the ground floor w/ bathroom and dining/teaching spaces. Above there will be 2 stories of residential apartment units (1 apartment per floor) connected via an Exit Access Stair and Elevator. The mechanical equipment will be present in the roof, adjacent to a small rooftop patio space. There will be a pool, fire pit and exterior showers in the backyard area, surrounded by permeable driveway and parking spaces with Electric Vehicle charging stations. Accessory structures for storage and garbage cans will be adjacent to the parking area







Project Number 46135
Project
828-30 Union St.
New Orleans, LA 70112
Part 1:
Received:
Status:
03/02/2023

Part 2:
Received:
Fee Received:
Status:

Part 3:
Received:
Fee Received:
Status:

------------------------------------------------------------------------------
Project Number 46134
Project
826 Union St.
New Orleans, LA 70112
Part 1:
Received:
Status:
03/02/2023

Part 2:
Received:
Fee Received:
Status:

Part 3:
Received:
Fee Received:
Status:








Project Number 46132
Project
3001-3007 Chartres St.
New Orleans, LA 70117
Part 1:
Received:
Status:
02/27/2023

Part 2:
Received:
Fee Received:
Status:

Part 3:
Received:
Fee Received:
Status:




















Reply With Quote
     
     
  #19557  
Old Posted Mar 7, 2023, 4:17 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Las Cruces











438 Canal St·Renovation (Non-Structural) · Ref Code:J1SFQ5
View Download (1) Print Summary Submit Add to Watch List
Type:
Renovation (Non-Structural)
Applicant:
Heather Cooper
Status:
Application Submitted
Date Filed:
3/3/2023
Closed:
No
Description:
Renovation of an existing tenant space. New exterior doors and cladding.











1212 Magazine St·HDLC COA · Ref Code:H8KEJ4
View Print Summary Submit Add to Watch List
Type:
HDLC COA
Applicant:
Rapier Lane
Status:
Completeness Review
Date Filed:
3/6/2023
Closed:
No
Description:
Renovation of a Contributing rated, two-story, bed and breakfast including restoring the double gallery façade





204 St Charles Ave·Renovation (Structural) · Ref Code:5E1H1A
Download (1) Print Summary Submit Add to Watch List
Type:
Renovation (Structural)
Applicant:
Loretta Harmon
Status:
Application Submitted
Date Filed:
12/23/2022
Closed:
No
Description:
Renovation of 4 story building into new hotel. Addition of 3 story column supported gallery.

Reply With Quote
     
     
  #19558  
Old Posted Mar 7, 2023, 5:08 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474














Reply With Quote
     
     
  #19559  
Old Posted Mar 7, 2023, 5:19 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
300 Gravier St·Renovation (Structural) · Permit #22-31107-RNVS · Ref Code:MW8TDV
View Download (10) Print Summary Submit Add to Watch List
Type:
Renovation (Structural)
Applicant:
Edr Architects
Status:
Permit Issued
Date Filed:
10/14/2022
Closed:
No
Description:
A RENOVATION OF THE EXISTING MEETING ROOM SPACES, POOL DECK AND A RECONFIGURATION OF EXISTING RESTROOMS AND FITNESS CENTER. THE SCOPE INCLUDES THE ADDITION OF A RESTROOM ON THE POOL DECK, A MAJORITY OF FINISHES THROUGHOUT AND A REFRESH OF ALL PLUMBING FIXTURES. ALL WORK TO BE DONE AS PER PLANS.









Reply With Quote
     
     
  #19560  
Old Posted Mar 7, 2023, 5:21 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474








Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 2:10 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.