Did a nice long lunch on my bike yesterday through RiNo and checked out all of the different sites:
Camden Rino:
The apartments at 34th and Walnut:
Not sure what this on back near 35th..... I think offices?......
The HUB Phase II.......
Walnut Street Lofts.....
The WTC site has remained unchanged unfortunately, no news there. I migrated over and up Brighton to check out the new Mission Ballroom area. Demolition of all of the existing buildings is complete now and there is a large amount of wide open dirt lots begging to be developed on. The building to the right (below) I think is offices, with the actual ballroom to the left. I didn't see any actual construction on the swaths of land surrounding the ballroom along Brighton, but this development has huge potential given it's location. For refreshers -
https://www.northwynkoop.com/
Moved down along Brighton to the Rev360 project.....
Pretty sure this is the "Vib" hotel site where they had a "ground breaking". Although the site remains undisturbed.
This is the NW corner of 36th and Brighton. According to the city site, this is supposed to be a Red Truck Brewery?
This is the Drive Train site where excavation is underway. If you look deep in the background, you will see a small black crane with some wood framing at the bottom. That's the "Redacted" rental project going up inside Taxi.
Here's the project at 31st and Brighton. Looks like they are just working on converting the existing space right now. Didn't really see any other construction there.