Cool animation of the future tolled 281 north of 1604.

The animation shows 281 from 1604 to Borgfeld Dr. which is 7 and a half miles north of 1604. That is where the 281 tolled freeway will end (for now).

The interchange you see will also be tolled.

http://www.youtube.com/watch?v=FRF-gqSlFOA

The construction should have began over a year ago and was a day from happening when a sewage link caused by workers setting up resulted in environmental groups seeking a lawsuit to stop construction, TXDOT and the Federal Highway Administration decided a full Environmental Impact Study would be needed before construction could begin. That study was finished a couple of months ago and results showed no harm to the environment. Construction on the 281 toll road should begin next spring.

I'm not for or against toll roads, however, anything that relieves that nightmare-ish traffic on 281 will be a god send. Especially with those mega planned projects at Stone Oak Parkway and 281.

BTW, future plans are to toll 281 all the way to FM 306 which is 23 miles north of 1604 which would be 16 miles added to the 7 plus planned now.

Last edited by sirkingwilliam; Apr 1, 2007 at 2:04 PM.
Reply With Quote
     
     
  #2  
Old Posted Apr 1, 2007, 2:09 PM
sirkingwilliam's Avatar
sirkingwilliam sirkingwilliam is offline
Loving SA 365 days a year
 
Join Date: Feb 2007
Location: San Antonio
Posts: 3,891
Some more information from the TexHwyMan website.

http://home.att.net/~texhwyman/us281exp.htm

He does a great job with information pertaining to SA and its freeway system.
Reply With Quote
     
     
  #3  
Old Posted Apr 1, 2007, 2:21 PM
texastarkus texastarkus is offline
Registered User
 
Join Date: May 2006
Location: Far Sub-Urban San Antonio
Posts: 443
A question for those living in San Antonio

How are toll roads seen in SA? I know in Austin, the anti-toll road lobby is very loud and even objects to toll-house cookies! It seems that everything TXDot builds now will have a toll plaza attached. In the recent past, I've seen mention the re-building of I-37 thru downtown. Will the residents agree to pay a toll once the re-build is complete? Will the good people of SAT agree to pay a toll to drive on 281?

Just wondering....
Reply With Quote
     
     
  #4  
Old Posted Apr 1, 2007, 5:49 PM
Double L's Avatar
Double L Double L is offline
Houston:Considered Good
 
Join Date: Nov 2002
Location: Houston
Posts: 4,846
It's very bad. They've shut down the plan for toll roads on 1604. My opinion of toll roads is that they are good as long as you also have an efficient non-toll option heading in the same direction.
Reply With Quote
     
     
  #5  
Old Posted Apr 1, 2007, 10:00 PM
texastarkus texastarkus is offline
Registered User
 
Join Date: May 2006
Location: Far Sub-Urban San Antonio
Posts: 443
So have projects been scrapped, delayed or put on hold for lack of funds since toll's are not an option?
Reply With Quote
     
     
  #6  
Old Posted Apr 1, 2007, 11:09 PM
sirkingwilliam's Avatar
sirkingwilliam sirkingwilliam is offline
Loving SA 365 days a year
 
Join Date: Feb 2007
Location: San Antonio
Posts: 3,891
Quote:
Originally Posted by Double L View Post
It's very bad. They've shut down the plan for toll roads on 1604.
Actually this is untrue. No toll road plans have been shut down.

281 was always the first segment to be tolled, it was first going to be just 281 to Stone Oak Parkway with future plans tolling 281 to Borgfeld Dr. Once 2005 construction was set to begin and the workers hit the sewage drain and the enviormental groups brought a lawsuit against TXDOT resulting in them having to get a new study down, which showed the tolls would cause no enviormental harm, TXDOT now plans to build the 281 to Borgfeld Dr. segment all at once starting next fall with future plans to toll 281 to FM 306.

Tolling 1604 is still a go and most likely will be privatized with Zachary and Cintra building the tolls and new or updated (tolled) interchanges at 1604/151, 1604/10W, 1604/281 (as part of the intial 281 toll), 1604/35, 1604/10E.

Future plans call for 10 being tolled from 1604 to Boerne and 35 from downtown to 1604 as well as a porposed elevated toll freeway running over Bandera Rd.

Last edited by sirkingwilliam; Apr 1, 2007 at 11:29 PM.
Reply With Quote
     
     
  #7  
Old Posted Apr 1, 2007, 11:12 PM
sirkingwilliam's Avatar
sirkingwilliam sirkingwilliam is offline
Loving SA 365 days a year
 
Join Date: Feb 2007
Location: San Antonio
Posts: 3,891
Quote:
Originally Posted by texastarkus View Post
So have projects been scrapped, delayed or put on hold for lack of funds since toll's are not an option?
Tolls are the opinion in terms of 281 and 1604.

No toll projects have been scrapped although liked mentioned before, the 281 toll roads were delayed because of a sewage leak that lead to a lawsuit. Plans are now to begin 281 construction sometime next spring or earlier.
Reply With Quote
     
     
  #8  
Old Posted Apr 1, 2007, 11:26 PM
sirkingwilliam's Avatar
sirkingwilliam sirkingwilliam is offline
Loving SA 365 days a year
 
Join Date: Feb 2007
Location: San Antonio
Posts: 3,891
Here's the map for the inital start system (yellow) and the future proposed (red) toll roads.



The Wurzbach Parkway portion actually has funding and will not need to be tolled. Not shown on there is 10 from 1604 to Boerne.

http://www.alamorma.org
Reply With Quote
     
     
  #9  
Old Posted Apr 1, 2007, 11:44 PM
texboy texboy is offline
constructor extrodinaire!
 
Join Date: Nov 2004
Location: Denver, CO
Posts: 1,616
If you think about it....just from taking a look at that map, where the toll roads are being built my actually spur more development in and around the CBD bc people may see that if they move closer to downtown, they won't have to pay to drive to work (besides gas) from the tolled lanes on the outer limits of the city.
Reply With Quote
     
     
  #10  
Old Posted Apr 2, 2007, 3:15 AM
Double L's Avatar
Double L Double L is offline
Houston:Considered Good
 
Join Date: Nov 2002
Location: Houston
Posts: 4,846
Reply With Quote
     
     
  #11  
Old Posted Apr 2, 2007, 3:48 AM
Mopacs's Avatar
Mopacs Mopacs is offline
Austinite
 
Join Date: Jul 2002
Location: Austin.TX.USA
Posts: 4,585
Question: So 281 is tolled well into Comal County... Frontage roads will be built, and utilized as the 'non-toll' alternative, of course. Now my question is, will this 'free' option be a step down over what is there now? In other words, will there be a continuous 55-65+ speed limit throughout the entire stretch? Anything less would be a major step down in my book.. Just wondering...
__________________
Austin.Texas.USA
Home of the 2005 National Champion Texas Longhorns
Reply With Quote
     
     
  #12  
Old Posted Apr 2, 2007, 10:08 PM
JACKinBeantown's Avatar
JACKinBeantown JACKinBeantown is offline
JACKinBeantown
 
Join Date: Jun 2003
Location: Location: Location:
Posts: 8,847
All that pavement... not one rail track. That's bad planning.
__________________
Hi.
Reply With Quote
     
     
  #13  
Old Posted Apr 6, 2007, 12:01 AM
trafficdogn trafficdogn is offline
Registered User
 
Join Date: Mar 2006
Posts: 13
great video.

shows how totally inefficent our access road system is.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Texas & Southcentral > San Antonio
Forum Jump



Forum Jump


All times are GMT. The time now is 7:31 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.