HomeDiagramsDatabaseMapsForum
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan

About The Ads  This week the ad company used in the forum will be monitoring activity and doing some tests to identify any problems which users may be experiencing. If at any time this week you get pop-ups, redirects, etc. as a result of ads please let us know by sending an email to forum@skyscraperpage.com or post in the ads complaint thread. Thank you for your participation.


Reply

 
Thread Tools Display Modes
     
     
  #1  
Old Posted Jun 17, 2019, 6:11 AM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is online now
Registered User
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba, Canada
Posts: 4,272
Winnipeg Construction X

Winnipeg Construction X



Courtesy of Dan Harper Photography

Previous construction threads:
Winnipeg Construction 9
Winnipeg Construction 8
Winnipeg Construction 7
Winnipeg Construction 6
Winnipeg Construction 5
Winnipeg Construction 4
Winnipeg Construction 3
Winnipeg Construction 2
Winnipeg Construction 1


Winnipeg Developments


Inuit Art Centre at the Winnipeg Art Gallery
Location: 300 Memorial Blvd, Winnipeg, MB
Architect: Michael Maltzan Architecture
Developers: Winnipeg Art Gallery
Size: 40,000 sq. ft. Addition to existing art gallery facility
Completed: 2020 (targeted)
Budget: $65 M
Project Thread: http://forum.skyscraperpage.com/show...light=winnipeg
Status: U/C


True North Square (Phase 1 complete, 17 floor Scotia Bank Tower & 25 floor retail, boutique office & residential tower)
Location: 242 Hargrave St, Winnipeg, MB
Developers: True North Real Estate Development Limited, True North Sports and Entertainment, James Richardson & Sons Limited, Northland Properties
Architect(s) : Perkins+Will in association with Architecture 49
Construction Manager: PCL Constructors Canada Inc
Completion: 2023
Size: 1.5M+ square feet
Project Type: office, retail, residential, hotel
Cost: $650 M+
Project Thread: http://forum.skyscraperpage.com/show...light=winnipeg
Status: U/C

True North Square Phase 2:
Sutton Place Hotel & Residences at True North Square
18-storey hotel tower, 13-storey La Grande Residences on 4-storey podium of retail & parking
Status: U/C
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=130
Video Link



True North Square Phase 3:
Wawanesa Mutual Insurance Company HQ
Address: 236 Carlton St Winnipeg, MB
Location: https://www.google.com/maps/place/23...!4d-97.1452369
Developer: True North Real Estate Development (TNRED) & The Wawanesa Mutual Insurance Company
Architect: Architecture49
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=133
Video Link



300 Main Street Apartment Tower
Location: 300 Main Street
Developers: Artis REIT https://300main.ca/
Architect: Raymond SC Wan Architects http://raymondscwanarchitect.com/300-main/
Floors: 42
Height: 465' | 142M
Phase 1: Reclad existing tower at 360 Main (complete)
Phase 2: Residential highrise (under construction)
Project Thread: http://forum.skyscraperpage.com/show...light=winnipeg
Status: U/C
Video Link



Canada's Diversity Gardens
Location: Assiniboine Park Winnipeg, MB
Developers: Assiniboine Park Conservancy
Architect(s) : KPMB (Design Architect) in association with Architecture 49
Completion: 2020
Size: 84,400 s.f.
Project Type: Cultural
Cost: 97.5M
Status: U/C
Description: 21st century botanical conservatory situated at the head of an existing Formal Garden at Assiniboine Park designed for LEED Silver Certification. It will be a signature piece of architecture that generates awareness and a presence in the park, an interactive destination that focuses on the interrelationships of plants and people, and a sustainable precedent focussing on horticulture, plants and the environment.
Fact: Main structure 'The Leaf' will be made of an extremely lightweight see-through plastic Ethylene tetrafluoroethylene (ETFE) and will contain the largest indoor waterfall in canada at 6-storey in height.
Project Thread: http://forum.skyscraperpage.com/show...light=winnipeg
Video Link



Women's and Newborn Hospital
Location: 665 William Ave, Winnipeg, MB
Architect(s): Architecture49 & Parkin Architects
Developer: Province of Manitoba/Winnipeg Regional Health Authority/Health Sciences Centre
Construction Manager: EllisDon
Status: U/C, Official opening Dec 2019
Cost: $232 million
Size: 388,500-square-ft 5-storey
Media: HSC prepares for birth of new Women's Hospital in December
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=149
Description: Targeting LEED® Silver Certification. Located at the Health Sciences Centre, the largest health care centre in Manitoba the WNH will feature 173 new beds , state of the art ambulance bays, triage, and retail services, a new NICU unit, operating rooms, post-partum units, and spiritual centres - including a ceremonial space for smudging. The new hospital will be a place of caring support for all the diverse families of Winnipeg and Manitoba. From single-patient rooms with large windows, a super-efficient layout for medical units and highly sustainable and calming green roof, the Women and Newborn Hospital is designed to be welcoming, respectful, and peaceful for families. The new hospital is the largest capital health project ever undertaken in Manitoba.

The Women's and Newborn Hospital's exterior features a curtain wall with a picture of an elm-tree digitally printed on the glass.


Richardson Innovation Centre
Location: Westbrook Street and Lombard Avenue
Architect(s) : Number TEN Architectural Group
Developers: Richardson International
Size: 62,000 sq. ft.
Budget: $30M
Completed: 2020 (targeted)
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=232883
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...2&postcount=64
Status: U/C
Description: Innovation Centre in the heart of downtown Winnipeg, featuring state-of-the-art technology and equipment for research and product development.


West Broadway Commons
Location: 175 Colony Street
Architect: Number TEN
Developers: UWCRC 2.0 Inc. and All Saints Anglican Church (Joint Venture Owners)
Construction Manager: Bockstael Construction
Size: 62,000 sq. ft.
Completed: 2020 (targeted)
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=233329
Status: U/C
110-unit, mixed-income apartments, with over 3,000ft2 of street-level commercial space


Red River College - Innovation Centre Exchange District Campus
Location: Location: 319 Elgin Avenue, Winnipeg, MB, Downtown Exchange District Campus
Architect: Diamond Schmitt Architects inc. and Number TEN Architectural Group
Developers: Red River College
Size: 100,000 sq. ft.
Budget: $95M
Completed: 2020 (targeted)
Project Thread: http://forum.skyscraperpage.com/show...light=winnipeg
Status: U/C
Video Link



Hyatt Place Downtown
Location: 138 Portage Avenue East
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=234120
Status: U/C


Arts District
Location: 290 ColonyStreet
Size: 103,000 SQ FT
Architect(s): Michael Maltzan Architecture
Construction Manager: Bockstael Construction
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=233330
Status: U/C
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=109
Description: 119 studio, one, two and three bedroom residential units


Warehouse 1885
Address:104/108 Princess Street, Winnipeg, MB Winnipeg, MB
Location:https://www.google.com/maps/place/10...!4d-97.1421145
Developer: Legatum Development
Architect: http://www.5468796.ca/
Status: U/C
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=126
Description: Redevelop two existing landmark properties on the corner of Princess/Bannatyne into 39 desirable residential rental units plus 5,500 sq/f of commercial space on the main floor.
The renovation will construct a 3 Storey addition on top of 108 Princess to accommodate more rental units plus access to rooftop patio on 104 Princess.


James Ave Pumping Station Redevelopment
Location: 109 James Avenue, Winnipeg, MB
Developers: ALSTON PROPERTIES LTD.
Architect(s) : 5468796 Architecture Inc
Status: U/C
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=223833
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=122
Phase 1: 18,600 SF of office/retail space in the James Ave Pumping Station Building. Slated for demolition after 17 attempts to revive the historic structure over the last 14 years, the James Avenue Pumping Station was successfully preserved through the development of a financial / building pro forma that would make it financially feasible. 100% leased. Spring 2018 occupancy.
Phase 2: 28 high end rental apartments on Waterfront Drive available spring 2020.
Phase 3: 65 rental apartments. Winter 2021 occupancy.


Medical Arts Building Redevelopment (Apartments)
Location: 233 Kennedy St, Winnipeg, MB
Developer: Timbercreek
Architect: Number TEN Architectural Group
Status: U/C
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=162
Description: Timbercreek plans include to complete an office redevelopment for a portion of the property including 14,000 square feet of commercial space and a broader conversion to 104 loft residential multi-family units.
Media: Downtown tower redevelopment to include apartments, office and retail space


OSBORNE PLACE AT THE STATION (Phase 2)
Location 265 Osborne St
Developer: Imperial Properties Winnipeg https://www.imperialproperties.ca/ou...SACEgKo_vD_BwE
Architect: DIN Projects http://www.dinprojects.ca/#http://ww...o/257-osborne/
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=220693
Status: U/C



THE SPOT AT EAST VILLAGE
Location: 221 Stradbrook Ave
Developer: Private Pension Partners
Architects: MMP Architects Inc.
Contractor: Akman Construction Ltd.
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...3&postcount=80
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=230613
Status: U/C
Description: 18 Storey Residential Apartment with 145 units


380 Osborne
Location: 380 Osborne
Developer:
Architect: DIN Projects
Status: U/C
Media: Infill apartment block planned for 380 Osborne
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...7&postcount=81
Description: 7-storey residential mixed use building with 71 dwelling units and one commercial spac ewith two levels of indoor parking, one underground and one at grade


The Arc
Location: Location: 2525 Pembina Hwy , Winnipeg, MB
Architect: Architects + Research + Knowledge, Inc.
Developer: Campus Suites
Size: 352-unit, 16-storey multi-family building
Completion date: Unknown
Budget: $70 M
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=236081
Status: U/C
http://clkapps.winnipeg.ca/DMIS/View...ctionId=493074
Video Link



281 River Ave
Location: 281 River Ave, Winnipeg, MB
Architect: ] BLDG architecture office inc.
Developer: Towers Realty Group
Size: five-storey, 100-unit residential complex
Status: Proposed


Royal Aviation Museum of Western Canada
Location: Winnipeg Airports Authority campus on Wellington Avenue
Developer: Royal Aviation Museum of Western Canada
Architect(s): Architecture 49
Budget $45 million
Size 86,000 sf
Status: Proposed Scheduled to open 2021
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=101
Media: Ottawa set to announce $8.8 million for the Royal Aviation Museum


Market Lands (2 phases)

Phase 1:The ‘New Market Square’
Location: 151 - 171 Princess Street
Developer: CentreVenture Development Corporation & Winnipeg Housing Rehabilitation Corporation
Architect: Daoust Lestage https://daoustlestage.com/en/project/market-lands/
Status: Proposed
Project Thread: http://forum.skyscraperpage.com/show...light=winnipeg
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=110
Description: Redevelopment site of former Public Safety Building and civic parkade in The east Exchange District


710 Westminster Ave
Location: 710 Westminster Ave, Winnipeg, MB
Developer: Chanden Homes Ltd.
Architect(s): Unit 7 Architecture
Status: U/C
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=114
Media: Luxury rentals in West Broadway, Close to Sherbrook Street cafés, restaurants
Description: The building includes approximately 11,600 sq.ft. of leasable commercial space on two levels; close to 31,000 sq.ft. of apartments on four levels for a total of 44 living units; and a 12,800 sq.ft./42-car parking area, of which half is protected under the building.


98 Albert street
Location: 90 Albert St & 98 Albert street Winnipeg, MB
Developer: Unknown
Architect(s) : AtLRG Architecture Inc.
Status: U/C
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=119
Description: 3-storey wedge, main floor restaurant space with future sidewalk patio, 2 prestige residential units and rooftop terrace with garden


50 Hargrave
Location: 44 Hargrave (South Broadway)
Developer: The Sunrex Group of Companies
Architect(s) : AtLRG Architecture Inc.
Status: U/C
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=120
Description: A 6 storey, 65 suite downtown in-fill apartment building with surface level open-air parking behind the building.


31 Riel Ave
Address: 31 Riel Ave street Winnipeg, MB
Location: https://www.google.com/maps/place/31...!4d-97.1163212
Developer: http://www.trademarkbuilders.ca/ https://www.instagram.com/trademarkbuilders/
Architect: https://www.atlrg.ca/
Status: Proposed
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=121
Description: A four-storey, 82 suite residential building with ground floor commercial suites complete with underground parking. The gable roof extends the amount of liveable space with the inclusion of brightly-lit mezzanine space for the forth floor suites, while also providing a distinctive identity to the local multi-family housing typology.


703 St Annes Road
Location: 703 St Annes Road, Winnipeg, MB
Developers: ALSTON PROPERTIES LTD.
Architect(s) : AtLRG Architecture
Status: U/C
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=144
Description: 33 new rental apartments located on the banks of The Seine River in Winnipeg


238 wellington crescent
Address: 238 wellington crescent Winnipeg, MB
Location: https://www.google.com/maps/place/23...67!4d-97.15065
Developer: http://trademarkbuilders.ca
Architect: http://www.5468796.ca/
Status: Proposed
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=123
Description: Infill development in a mature Winnipeg neighbourhood is starting construction. Six units replacing a single house on Wellington in Osborne.


Smith Street Lofts
Location: 185 Smith St Winnipeg, MB
Developer: Edison Properties
Architect(s) : MMP Architects Inc.
Construction Manager: Akman Construction Ltd.
Status: U/C
Project Thread: https://forum.skyscraperpage.com/sho...d.php?t=240240
Description: Former social housing complex being retrofitted to mix of 250 market-rate rentals and affordable units, renovations expected to be completed in 2021
Media: Smith Street tower will 'look like a very different building'


Mayfair Tower
Location: 109 Mayfair Winnipeg, MB
Developer:
Architects: Otto Cheng Architect Incorporated
Status: Proposed
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=131
Description: WRE Developments is considering the construction of a 15-storey, 96 unit residential apartment building located at 109 Mayfair across from downtown along the Assiniboine River.
http://landmarkplanning.ca/project/1...air-avenue.php


NewPortCenter Redevelopment
Location: 330 Portage Ave, Winnipeg, MB
Developer: KingSett Real Estate Growth LP No. 6 and CCI Corpfin Capital Acquisition Fund 1 LP
Status: U/C
Description:Lobby renovations, podium refurbishment & exterior reclad



200 Portage Ave.
Location: 200 Portage Ave
Developer: 200 Portage INC. (Carmyn Aleshka)
Status: U/C
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...2&postcount=75
Description:Landlord has comprehensive plan to completely renovate 200 Portage, including the main floor and concourse space, redevelopment plans include upgraded floor to ceiling windows giving unprecedented 360° views of Portage and Main and flooding office spaces with natural light. Other upgrades include new curtain wall, doors, lobbies and elevators which will be replaced or upgraded.


201 Portage Avenue lobby renovations
Address: 201 Portage Winnipeg, MB
Developer: Harvard Property Management Inc
Status: Proposed



825 Taché
http://825tache.com/concept/
Address: 825 Taché
Developer: Sunstone Group
Status: Proposed
Project Thread: https://forum.skyscraperpage.com/sho...d.php?t=224415
Seven (7) storey residential condominium building containing 78 units along the Red River at Taché Avenue and Rue Hébert;


NOTRE TERRACE
Location: 173 Notre Dame St
Developer: Ironclad Developments Inc.
Architects:
Status:U/C
Description: 5-storey, 78 unit multi-family residential infill development in Old St. Boniface, replacing existing commercial warehouse/junk yard.


320 River Avenue
Address: 320 River Avenue
Location: https://www.google.ca/maps/@49.88102...7i13312!8i6656
Architects: http://www.prairiearchitects.ca/
Status: Proposed
3-storey multifamily building with 12 units, he development is clad in brick with some corten steel accents, The development locates the parking inside the building


456 Bannatyne Avenue
Address: 456 Bannatyne Avenue
Location:https://www.google.com/maps/place/45...60692329565936
Architects: http://www.h5architecture.ca/
Status: Proposed
(4) storey mixed use building comprising of twenty six (26) residential units above ground and one (1) commercial unit at grade. The existing row housing on site will be removed.


South Towers Project
Address: Winnipeg, Manitoba
Architects: http://www.h5architecture.ca/
Developer: Stride Development Corporation http://www.stridedevelopment.ca/featured.html
Status: Development
The South Towers Project is strategically located on a highly sought after site in South Winnipeg. This exciting state of the art project will have 315 rental apartments within two (2) towers of 18 and 24 stories.


Terrasse Boisjoli
Location: 989 Ducharme Avenue, St. Norbert, Winnipeg,
Developer: https://legatumdevelopment.co/
Architect(s): 5468796 Architecture Inc
Status: U/C
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=103
Media: Renaissance underway in St. Norbert, Planned residential complex incorporates elements of Franco-Manitoban architecture
Description: Terrasse Boisjoli is a new 5 storey mixed-use multi-family project consisting of 40 1-and 2-bedroom suites, in-suite laundry, 9ft ceilings, heated indoor parking, and commercial space on the ground floor.


3021 Pembina Highway
Address: 3021 Pembina Highway
Location:https://www.google.ca/maps/@49.78298...7i13312!8i6656
Architects: Affinity Architecture Daniel Serhal
Developer: https://privatepensionpartners.com/
Status: Proposed
Project Thread: http://forum.skyscraperpage.com/show...hlight=pembina
2 apartment towers 13 and 15 storeys, combined 410 residential units.


30UC
Address: 30 University Crescent
Location: https://www.google.com/maps/place/30...6!4d-97.150574
Architects: http://www.bldgoffice.com/30-university-crescent
Developer: Paragon Design Build https://paragondesignbuild.com/
Status: U/C
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=137
Media: https://www.winnipegfreepress.com/bu...506020412.html
Description: Seven storey 104 unit multi-family residential building


LE QUARTIER
Address: 174 Provencher Blvd
Location:https://www.google.com/maps/place/17...xB0wAHoECAoQAg
Architects: northern sky architecture inc
Developer: KAI Properties
Status: Proposed
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=106


Address: 139 Notre Dame St
Location:https://www.google.ca/maps/place/139...!4d-97.1253026
Architects: https://www.2architecture.ca/
Status: Proposed


Address: Dumoulin and Langevin
Location:https://www.google.ca/maps/@49.89379...7i13312!8i6656
Architects: https://www.2architecture.ca/
Status: Proposed
60-70 Unit 4 storey residential


Address: 235 Dumoulin St
Location:https://www.google.ca/maps/place/235...!4d-97.1200569
Architects: https://www.2architecture.ca/
Status: Proposed
2 Storey townhouse, 6 1000 sq2 units


(RESIDENCE LANGEVIN)
Address: 210 rue Masson
Location:https://www.google.ca/maps/place/210...5!4d-97.120443
Architects: https://www.ft3.ca/
Developer: Towers Realty Group
Status: Proposed
Media: https://ici.radio-canada.ca/nouvelle...oniface-projet
60 unit, 4 storey residential. According to the plan, the three facades of the former 1902 Francophone Normal School will be preserved.


Railside Residential Village at The Forks
PDF Storyboard: http://s3.documentcloud.org/document...al-package.pdf
Developer: The Forks North Portage Partnership
Status: Proposed
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=217747
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=108
Description: Railside at The Forks[/B] is a new kind of development and a major step in the evolution of The Forks. Railside represents the first ever opportunity for residential development at The Forks, on two parking lots known as Railside and Parcel 4. Remaining true to The Forks' founding vision, this significant mixed-use project will build on the site's abundant cultural background.



BOXCAR ALLEY at Union Station
Location: Union Station/The Forks, Winnipeg, MB
Developer: The Forks North Portage Partnership
Architects: PUBLIC CITY
Status: Proposed
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=108
Description: As a part of the Railside Residential Village at The Forks development, The Box Car Alley design playfully highlights the space under the CN rail line at the Forks, a space that is currently under-utilized and overlooked. The project seeks to brighten the peripheries of The Forks, revitalizing an important public space through public engagement, local business promotion and creative opportunities for artists and visitors.


The Forks National Heritage Site Visitor Centre
Location: 45 Forks Market Road, The Forks National Historic Site, Winnipeg, MB
Developer: The Forks North Portage Partnership
Architect(s): 1x1 architecture inc.
Size: 7,653 sq.ft.
Status: Proposed
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=159
Description: Due to the requirement by Parks Canada to not increase the built form on the protected site, the proposed Visitor Centre is located at the site of the existing orientation node, and will renovate the existing washroom / office building which consists of a circular structure constructed of tyndall stone plinths carrying a wood trellis. A major east-west axis cuts through the National Historic Site. From the west, this axis starts at the dome of Union Station, situated at the end of the Broadway promenade, continues through the centre of the orientation node and culminates at the Saint Boniface Cathedral-Basilica Parish on the east side of the Red River. This axis symbolically connects St. Boniface to Winnipeg’s downtown. The design intent was not only to maintain this axis, but to enhance it, thus the Visitor Centre was split into two buildings.


WHL Arena
Location: Oak Bluff
Developer: 50 Below Sports + Entertainment
Status: Proposed
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=237550
4,500-seat areana, home to the WHL's Winnipeg Ice
Video Link



928 and 936 McMillan Avenue
Location: 928 and 936 McMillan Avenue
Developer: Progressive Real Estate
Architects: Affinity Architecture Inc
Status: Proposed
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=112
Description: Office space proposed for 2nd and 3rd floor, 4 residential units proposed for top floor
Media The Sou'wester


PRINCESS STREET APARTMENTS
Location 265 Princess St, Exchange District
Developer: Unknown
Architects: VERNE REIMER ARCHITECTURE INCORPORATED
Status: Proposed
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=113
Description: 88 Apartment Units


Urban Square
Location: 206 Good Street (West Broadway)
Developer: Ironclad Developments Inc.
Architects:
Status: Approval stage
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=115
Description: Six storey multifamily residential building with 145 units.
Media: Approval sought for West Broadway complex; Addition of 145 units would ease city's need for new housing, councillor says


129 McDermot Avenue
Location: 129 McDermot Avenue, Exchange District
Developer: United Equities Group
Architects: Number Ten
Status: Proposed Multiple development options available with large floor plate ((+/-) 24,000 SF)
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=118


Dexter House
Location 93 Nassau St
Developer: Lount Corporation
Architect(s): Neil Cooper Architect
Contractor: Canotech Consultants Ltd.
Status: U/C
Description: 4 storey 13 unit Apartment
Media: Winnipeg’s Lount Corp. develops new niche: Luxury apartments


Portage Place Redevelopment
Location: 393 Portage Ave
Developer: Starlight Investments
Status: Development stage, Pending sale of property
Project Thread: https://forum.skyscraperpage.com/sho...d.php?t=240158
Description: $300 million investment to redevelop the mall, including the possibility of constructing student housing above the mall.


Upper Fort Garry Provincial Park Interpretive Centre
Location: Assiniboine Ave
Architects: designed by landscape architects Hilderman Thomas Frank Cram and architects Cohlmeyer Architecture Ltd.
Status: Proposed Fundraising stage
Description: An interpretive centre, complete with exhibit space, a multi-purpose theatre, food service, a digital library and office space, will be the final piece within the park.


160 Osborne St
Location: 160 Osborne St
Developer: Private Pension Partners
Architect(s) : BLDG architecture office inc.
Status: Development stage
Construction Manager: Pre-Con Builders
Construction Pics: https://forum.skyscraperpage.com/sho...&postcount=139
Project Thread: https://forum.skyscraperpage.com/sho...d.php?t=240379
Description: 3 new buildings at the site of the (soon to be demolished) Osborne Village Inn. All three buildings will have covered and underground parking with 207 apartment suites across two lots, a total of 54,110-square-feet and about 14,000 square feet of combined commercial space at street level.
Media: Redevelopment of Osborne Village Inn passes first test
  • 160 Osborne St, a six-storey,mixed-use, multi-family apartment building with 89 units
  • 424 and 425 Wardlaw Ave. two four-storey, mixed-use, multi-family complexes with 59 units each


780 Taché
Location: 780 Taché Ave, (North St. Boniface)
Developer: StreetSide Developments
Architect(s) : Unknown
Status: Development stage
Construction Manager: Unknown
Description: StreetSide Developments is currently preparing an application to rezone land so that it can eventually be developed as a 6-storey, woodframe multi-family housing, featuring approximately 94 units and 110-stall underground parkade.


FORTWHYTE ALIVE EXPANSION
Location: 2505 McGillivray Blvd
Developer: FortWhyte Alive Outdoor Adventure Center
Architect(s): Unknown
Status: Proposed - Construction is slated to begin late 2019
Construction Manager: Unknown
Description: Funding will support FortWhyte Alive in two extensive improvement projects:
  • The renovation of one of FortWhyte Alive’s key facilities – a deep energy retrofit and interior renovation of the iconic 35-year old Interpretive Centre.
  • The construction of a new facility, Buffalo Crossing – an 18,000 square foot multi-purpose building that will serve as a new southern gateway to FortWhyte from McGillivray Blvd. and a hub for new and creative outdoor recreation and education.


Gregg Building (Residential Conversion)
Location: 52 Albert Street, Winnipeg, MB
Developers: Knysh Construction
Status: U/C
Media: 'Rock-solid' reincarnation
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=140
Description: Unoccupied for over a decade plans are to keep the first two floors as commercial space, while floors three, four, and five will be potentially converted into 16 residential spaces.


Norwood Hotel renewal
Location: 112 Marion St.
Developer: Sparrow Hotels
Architects: FRANK Architecture
Contractor: PCL Construction
Status: U/C September 2019 target
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=150
Description: Renovate the interior of the existing restaurant located to the east of the existing hotel. The work also includes exterior alterations to the street facing façade.
The façade upgrades include the following:
o Additional openings for windows;
o Replacement of the existing windows with new larger windows including muntins;
o A new design for the main entrance as well as the secondary entrance;
o Replacement of the existing cladding materials with a darker brick;
o New façade lighting.

Norwood Hotel before

Norwood Hotel after rendering

Cornish Library (ADDITION AND RENOVATION)
Location: 20 WestGate, Winnipeg, MB
Developer: City of Winnipeg
Architects: PUBLIC CITY
Cost: $2.8M
Status: U/C, Summer 2020 opening
Media: Cornish Library closes for upgrades
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=154
Description: Renovations to 104+ year old heritage building include accessible entrance and washroom, complete redesign of spaces with adult, children's and teen areas on main floor, a computer area, and study and leisure spaces. An addition to the south of the building will feature an inviting glass reading room, overlooking both the gardens and riverbank, providing an intriguing view from Sherbrook Street to the northwest.



Bill and Helen Norrie Library
Location: Cambridge Street and Grant Avenue, Winnipeg, MB
Developer: City of Winnipeg
Architects: LM Architectural Group
Contractor: Boretta Construction
Size: 14,000 Sq Ft
Cost: $6.3M
Status: completion date in late 2020
Media: Proposed design calls for City’s first non-gendered, universal washroom
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=129
Description: The new library will be northwest of the Pan Am Pool, near the intersection of Poseidon Bay and Cambridge Street. It will take up 14,000 square feet in the Grant Park campus and will replace the existing River Heights Library at 1520 Corydon Ave. The new library is set to open in 2021.


216 Sherbrook
Location: 216 Sherbrook St, Winnipeg, MB
Developer(s): Almaleki Developments Inc
Architect(s)/Engingeers: Unknown
Construction Manager: Ross Construction Limited
Completion: Unknown
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=164
Description: 216 Sherbrook will be a mix use project featuring stunning, luxurious apartments with incredible amenities like a rooftop terrace, top of the line finishes and so much more. This project will also include commercial space with exciting businesses to be announced very soon!
Status: U/C


CRESCENT DRIVE PARK PAVILION
Location: 781 Crescent Drive, Winnipeg, MB
Developer: City of Winnipeg
Architects: PUBLIC CITY
Cost: $850,000
Status: U/C
Media: Design for Crescent Drive Park pavilion revealed
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=157
Description: Crescent Drive Park Pavilion is an amenity structure that reaches into the landscape to support four-season activity beyond the building and within Winnipeg’s urban forest. Framed with native plantings, the structure supports new washrooms and change rooms and includes a fire pit, barbeque areas, and a skate change area.


Misericordia Assisted Living
Location: 691 Wolseley Ave.
Developer: Misericordia Corporation, Kastes Planning & Development
Architec(ts): Raymond SC Wan Architect Inc.
Contractor: Concord Projects Ltd.
Status: Proposed
Media: Seniors housing to replace Misericordia resource centre
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=160
Description: 10-storey 97 suite seniors living complex in West Broadway


Uptown Theatre (Redevelopment)
Location: 394 Academy Rd, Winnipeg, MB
Developers: Globe property management
Architect(s)/Engingeers: Nejmark Architect
Construction Manager: Concord Projects Ltd
Completion: Unknown
Description: The Uptown Theatre is a historic gem, located in the heart of the walkable Academy Road commercial area in River Heights. Redevelopment plans of this historic former theatre and bowling alley into a mixed-use development include 23 residential rental units ranging from 800 to 1,020 square feet, 4,000 sq. ft. of office space on the second floor and two ground-level retail storefronts.
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=166
Media: New life for River Heights landmark, Developer has vision for former theatre, bowling alley
Status: U/C


Winnipeg Hotel (Heritage restoration)
Location: 214 Main St
Developer: John Pollard
Architect: Unit 7 Architecture
Contractor: Jilmark Construction Ltd.
Status: In development
Media: Closing time for Winnipeg Hotel
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=167
Description: The hotel at 214 Main St. opened in 1881, it was purchased three years ago by a holding company fronted by John Pollard, co-chief executive officer of Pollard Banknote Ltd, plans are to refurbish the building and redevelop it into a boutique hotel. Pollard anticipates it could take as long as three years to complete the renovations on the Winnipeg Hotel.
A Brief History of the Winnipeg Hotel


National Research Council (NRC) advanced manufacturing development facility
Location: CentrePort Canada
Developer: National Research Council Canada
Architects: Number Ten Architectural Group & Diamond and Schmitt Architects Inc,
Contractor: Penn-Co Construction Canada (2003) Ltd.
Status: U/C
Media: National Research Council to be new CentrePort Canada tenant
Description: The 70,000-square-foot $60-million building will be located at CentrePort Canada, North America’s largest inland port, will broadly support the advanced manufacturing sector in areas such as additive manufacturing (3D printing), robotics and the integration of new digital technologies, such as artificial intelligence and the Internet of Things, into the manufacturing process. When completed, it will accommodate about 100 people, 40 per cent of those working in the building at any given time will be NRC staffers, while the rest will be from industry and academia.


Great West Metal (Redevelopment)
Location: 90 Alexander Ave (Exchange District)
Developer: RNDSQR
Architects: 5468796 Architecture
Contractor: Unknown
Status: Proposed
Media: Waterfront wrap-around, Calgary developers planning to surround a rehabilitated heritage building with two new rental developments
Project thread: https://forum.skyscraperpage.com/sho...d.php?t=240542
Description: $100 million investment, 300 rental apartments split between two recently acquired properties including the current site of Great West Metal; plans also include to rehabilitate an existing heritage building to create 16,000-square-feet of commercial/office space.


Location: 469, 471, 473, 475 and 481 St. Anne’s Rd.
Developer: Ryan Ridge owner of Ridgix Building Solutions Inc.
Architects: Northern Sky Architecture Inc.
Contractor: Unknown
Status: Proposed
Media: New life for vacant sites in St. Vital
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=172
Description: Six-storey, mixed-use building in the Lavalee neighbourhood of St. Vital with 77 residential units — and five commercial spaces at street level.


Fort Rouge Gardens
Location: Infill TOD at Fort Rouge yards, Berwick ct at Argue St.
Developer: Ironclad Developments Inc.
Status: Proposed
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=173
Description: Transit oriented development at the Fort Rouge yards near the Fort Rouge Station along the Southwest Transitway.


96 Maryland St
Location: 96 Maryland St
Developer:
Architects: 2 Architecture Inc
Contractor:
Status: U/C
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=176
Board of Adjustment: April 4, 2018
Description: four-storey multi-family residential building with 6 units in Wolseley


The Point of Wellington
Location: 254 Wellington Crescent
Developer: G&E Homes
Architects: 2 Architecture Inc
Contractor:
Status: U/C
Media:
Description: New 13 unit apartment building located at the intersection of Gertrude and Wellington in Osborne Village. The building is located on a pie shaped lot next to a city park, with unobstructed views of the surrounding area from all apartments. The building includes enclosed underground heated parking, a beautiful common roof top terrace, and a car share program made available to tenants and the public.


Regent
Location: 500 Regent, Trasncona neighborhood
Developer:
Architects: 2 Architecture Inc
Contractor:
Status: Design Development
Media:
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=178
Description: Residential apartment, 6 units ,5,520 SQ.FT


REVIVAL
Location: 817 St Paul ave. Winnipeg, MB
Developer: Privileged Communities
Architects:
Contractor:
Status: Design Development
Media:
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=179
Description: Infill apartment in the West End neighbourhood of St Mathews and Minto


Das Haus
Location: 123 Scott St, Winnipeg, MB
Developer: Privileged Communities
Architect(s): 2 Architecture Inc
Contractor:
Status: U/C
Media:
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=180
Description: Residential apartment infill in the Osborne Village Neighborhood, a modern twist of the monopopy house with mix of 1 and 2 bedrooms units
http://clkapps.winnipeg.ca/dmis/View...ctionId=495453


153 Rue Aubert
Location: 153 Rue Aubert, Winnipeg, MB
Developer: Progressive Real Estate
Architects: Affinity Architecture Inc.
Contractor:
Status: U/C
Description: A 4-storey multi-family residential building complete with 20 residential units, two dwelling units at-grade with parking located at the rear of the building.


93 St. Anne’s Road
Location: 93 St. Anne’s Road, Winnipeg, MB
Developer: Wpg New Home Inc.
Architects: BLDG architecture office inc.
Status: U/C
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=194
Description: Mixed use development with 1,980 square feet of commercial space and parking at grade with two storeys of five (5) two bedroom residential units above.


350 River Ave.
Location: 350 River Ave. Winnipeg, MB
Developer: Andre Silva
Architect(s): 2 Architecture
Contractor:
Status: Proposed
Media: Changing plans over opposition; Osborne Village single-room-occupancy project revamped
Description: Plans are to redevelop lot it into a four-storey, single-room-occupancy building with 30 very small, private rooms. Shared spaces include kitchens, living and dining room, and roof terrace for social space.


Osborne to Downtown Walk Bike Bridge
Location: Assiniboine River crossing, McFadyen Park and Fort Rouge Park, Winnipeg, MB
Developer: City of Winnipeg
Architects: TBD
Contractor: TBD
Size: TBD
Cost: TBD
Status: design Stage
Media: 3 designs pitched for new pedestrian bridge over Assiniboine River
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=155
Description: A preliminary design for a new pedestrian and cycling bridge over the Assiniboine River will be developed to connect Osborne Village to Downtown via McFadyen Park on the north side of the river and Fort Rouge Park on the south side of the river. Considerations for this project include pedestrian and cycling connectivity throughout Osborne Village to Osborne Rapid Transit Station, Norwood Bridge, bike lanes on Nassau Street, and the riverwalk, upgrades to both McFadyen Park and Fort Rouge Park, crime prevention through environmental design (CPTED), and riverbank stabilization.
Bridge Option 2 of 3: Cable-Stayed Bridge:
Landmark double curved bridge:



Southwest Bus Rapid Transitway (Stage 2)
Cost: $467.3 million (estimate)
Description: The Southwest Transitway is a dedicated high-speed roadway for buses, physically separated from the regular street system linking Downtown to the southwest part of the city. Buses operate at speeds up to 80 km/h, free of any other traffic, providing very fast, reliable service. Stage 1 of the Southwest Transitway, completed in 2012, is 3.6 kilometres in length and currently runs from Queen Elizabeth Way & Stradbrook Avenue to Pembina Highway and Jubilee Avenue. Stage 2 includes a 7.6 kilometre southerly extension of the existing infrastructure from Pembina
Highway and Jubilee Avenue to the University of Manitoba. When completed in spring 2020, the Southwest Transitway will operate from Downtown to the neighbourhoods of southwest Winnipeg, including the University of Manitoba.
Estimated Completion: 2020
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=146



The Refinery District (Bishop Grandin Crossing)
Location: Bishop Grandin Boulevard and Newmarket Boulevard, Winnipeg, MB
Developer: Hopewell Development
Cost: $500+-million
Status: U/C
Description: The Refinery District is a planned 102 acre mixed-use infill development built on the former Manitoba Sugar Beet Factory property which is exceptionally well-located in Southwest Winnipeg offering residential flex-space options to users and developers. This property is surrounded by many of Winnipeg’s fastest growing and affluent residential communities, with this Transit Oriented Development (TOD) featuring a variety of active and traditional transportation options serviced by a designated station on the Rapid Transit Corridor.
Media: Bishop Grandin Crossing will have it all, $500-M development will tie in with city's rapid transit corridor




Kapyong Barracks Redevelopment
Location: Route 90/Grant Avenue, Winnipeg, MB
Developer: Treaty One Development Corporation & Canada Lands Company Limited
Status: Demolition & development stage
Cost: $2+ billion investment
Project Thread: https://forum.skyscraperpage.com/sho...d.php?t=218502
Description: Formerly part of Canadian Forces Base/17 Wing Winnipeg, the Kapyong Barracks property is located between the Tuxedo and River Heights neighbourhoods in southwest Winnipeg. The property is comprised of approximately 65 hectares of land and 40 buildings, and was home to 2nd Battalion Princess Patricia’s Canadian Light Infantry, until it relocated to Canadian Forces Base Shilo in 2004. Seven Treaty 1 First Nations will be taking over the Kapyong Barracks land with plans to develop the largest urban reserve in Canada. Around two-thirds of the abandoned military base is being developed by the Treaty 1 Development Corporation, and the rest of the property will be developed by Canada Lands Co., a Crown corporation. Plans may include a sports facility, hotel, convention centre, war museum and an Indigenous hospice, green space as well as low, medium and high density residential areas.



The Public Markets MRS
Location: St. Boniface, Winnipeg, MB
Developer: Olexa Developments
Status: Consultation Stage
Project Thread: https://forum.skyscraperpage.com/sho...d.php?t=239245
Description: The Public Markets Major Redevelopment Site is located within 4km of Downtown, Portage and Main, immediately to the east of the future Southeast Rapid Transit Corridor and bounded by industrial lands to the north and east, and rail lines to the south and west, single family south of the rail lines to the south and commercial, single family and multi-family west of the rail lines to the west. Approximately 185 acres of this total 222 acre Major Redevelopment Site has tremendous redevelopment potential as an infill, medium to high density housing, commercial and industrial development consistent with MRS policies outlined in Complete Communities on a vacant heavy (M3) industrial site.



Recently Completed


STERLING WINDOW LOFTS
Location: 283 Portage Avenue, Winnipeg, MB
Developers: Sunrex Management LTD.
Architect(s):
Status: Completed 2018
Media: 'Homes for 'hipsters' Century-old office building to be converted into affordable apartments, developers say
Description: Located downtown Winnipeg. The eight levels above the first floor commercial space of the century-old Sterling Building were once offices and have now been beautifully transformed into a residential complex of 64 suites which are a combination of studio and one bedroom "Micro-Apartments".



Boyce Lofts
Location: 316 Ross Avenue, Winnipeg, MB
Developers: ALSTON PROPERTIES LTD.
Architect(s) : Monteyne Architecture Works Inc.
Status: Completed 2018
Media: Century-old warehouse on Ross Ave. set to turn into 84-unit apartment complex, $12-M project will see addition of parkade, apartment complex
Description: Heritage building conversion + new addition. Built in 1905, this historic heritage building was once home to The Boyce Carriage Company - a key business in the Winnipeg manufacturing industry, has now been converted into 94 stylish and modern lofts in the heart of Winnipeg’s most exciting area - The Northern Exchange District.



Porter House
Location: 165 McDermot Avenue, Winnipeg, MB
Developers: ALSTON PROPERTIES LTD.
Architect(s):
Status: Completed 2018
Media: From Housewares to Home - The Porter Building
Description:A six story warehouse built in 1906 (top five storeys vacant since 1975. The building's final occupant, a nightclub, left the main floor and basement in 2004 resulting in the entire building being vacant) New purpose built 34 modern loft style apartments accented with century old features in the heart of Winnipeg’s vibrant East Exchange District

The Porter Building in 1907.


Windsor Park Library
Location: 1195 Archibald St, Winnipeg, MB
Developer: City of Winnipeg
Architects: David Penner Architects & Helio Rodrigues h5 Architecture
Contractor: Canotech Consultants Ltd.
Size: 8,000 Sq Ft
Cost: $4.9M
Status: completed March 2018
Media: Bigger, brighter, more accessible: New Windsor Park Library opens doors
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=152
Description: The new library includes a multi-purpose programming room, a tutorial room, and space for a collection of approximately 25,000 items. Tall glass walls surrounding the exterior, letting in natural light and views of the forest behind it, it also features an outdoor reading area and a mural designed by artist Simon Hughes.



390 On the River Condominiums
Location: 390 Assiniboine Ave
Architects: Verne Reimer Architecture & Mistecture Architecture & Interiors Inc
Contractor: Bockstael
Status: Completed November 2018
Description: 91 unit, 24 storey condo tower development
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=207408



McMillan Heights Condos
Location: 625 McMillan Avenue, Winnipeg, MB
Developer: Queenston Developments Ltd.
Status: Completed Fall 2018
Description: 4 luxery townhouse condominiums



Red River College Skilled Trades and Technology Centre
https://www.rrc.ca/fundraising/sttc/
Location: RRC’s Notre Dame Campus
Developer: Red River College
Architects: Number TEN Architectural Group
Contractor: Akman Construction Ltd.
Status: Completed November 2018
Description: state-of-the-art $60M 100,000 square foot Trades and Technology Centre housing new laboratory, shop space and classrooms for up to 1000 students per year in high demand trades and technologies.



Sherbrook Flats
https://sherbrookflats.com/
Location: 267 Sherbrook
Developer: Sotirios Corp
Architects: Sotirios Corp
Contractor: Akman Construction
Status: Completed June 2019
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=213278
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=127
Description: 6-storey 71 unit apartment block in West Broadway



The McMillan
http://themcmillan.ca//
Location: 958 McMillan Avenue
Developer: Ventura Developments
Contractor: Westland Construction Ltd.
Status: Completed June 2019
Description: Luxury development in Crescentwood/River Heights The high-end, multifamily project features 12 customizable residences, ranging in size from 1,200-1,500 sq. ft.



180 Roslyn Village Living
Location: 180 Roslyn, Osborne Village
Developer: Sunstone Resort Communities
Contractor: Graham Construction
Status: Completed June 2019
Description: 71,900 sq. ft. seven-storey 78-suite apartment complex in Winnipeg’s Osborne Village



1919 General Strike Monument 'Bloody Saturday'
Location: Pantages Playhouse Theatre Plaza
Artists: Bernie Miller and Noam Gonick
Status: Completed
Description: On a Saturday six weeks into the 1919 strike, tens of thousands of people gathered on Main Street at the former city hall to support striking workers and to protest the arrest days earlier of labour leaders.
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=128
Description: When a streetcar driven by strikebreakers approached, demonstrators rocked it off its tracks and set fire to it. The North West Mounted Police, joined by untrained special constables, rode into the crowd with clubs and guns. Bullets were fired. Two people died and dozens were injured as a result of the confrontation on a day now known as Bloody Saturday.



True North Square Phase 1:
17 floor Scotia Bank Tower, 242 Hargrave St
25 floor, 225 Carlton, retail, boutique office & residential
2 acres True North Square Plaza
Status: Completed July 2019
Project Thread: http://forum.skyscraperpage.com/show...light=winnipeg



FORTUNE BUILDING Heritage restoration
Address: 232 Main St Winnipeg, MB
Location: https://www.google.com/maps/place/23...!4d-97.1367114
Developer:John Pollard
Architect: https://www.u7arc.com/projects/displ...rtune-building
Status: Completed Summer 2019
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=124



Smartpark Innovation Hub
Location: 100 Innovation Dr, University of Manitoba, Winnipeg, MB
Architect(s): Cibinel Architecture Ltd
Developer: University of Manitoba
Status: Complete June 2019
Cost: $44.5 M
Size: 75,000-square-foot 4-storey
Media: Open for business; Smartpark Innovation Hub is where U of M's research gets commercialized
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=147
Description: Smartpark Innovation Hub is a central gathering place for the Smartpark community, for province-wide university researchers, and for the local technology industry. The facility will support commercialization and professional services, encouraging partnerships to form that will drive the creation of new technologies, ultimately growing the number of local start-up companies. The 75,000-square-foot building is made up of a ground floor atrium, meeting rooms, a multipurpose room with 4K video walls, and a food service area, as well as two lab spaces. The second, third and fourth floors are tenant office spaces, with the fourth floor containing a Collision Corridor, where tenants can come together and network in the shared space. Tenants include: Bold Commerce, North Forge Technology Exchange, Futurpreneur, Cibus Canada, Pembina Trails Early College School, the University of Manitoba Technology Transfer Office, 151 Research and Backswath Management.



Stanley Pauley Engineering Building
Location: 97 Dafoe Road, University of Manitoba, Winnipeg, MB
Architect(s)/Engineer: Stantec
Developer: University of Manitoba
Status: Complete, Official opening May 2019
Size: 46,000-square-ft
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=148
Description: The building houses a wide complement of engineering related programs and laboratories, including the Price Innovation and Prototyping Centre used by student design teams, Co-operative education space and the Internationally-Educated Engineers Qualification program.



Transcona Library
Location: 1 Transcona Blvd, Winnipeg, MB
Developer: City of Winnipeg
Architects: Cibinel Architecture
Contractor: Boretta Construction
Size: 13,500 sqft
Cost: $6.5M
Status: Completed March 2019
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=151
Description: new Transcona Library centrally located hub for the community of Transcona featuring an outdoor reading garden, collection space for 40,000+ items, energy efficient mechanical systems, LED lighting, planting of domestic vegetation, low volatile organic compound materials and energy efficient glazing for an abundance of natural light throughout the building.



St. John's Library (ADDITION AND RENOVATION)
Location: 500 Salter St., Winnipeg, MB
Developer: City of Winnipeg
Architects: PUBLIC CITY
Contractor: Canotech Consultants Ltd.
Size: 950-squrare-feet of new space added to 104-year-old heritage building
Cost: $2.8M
Status: completed July 2019
Media: Winnipeg’s St. John’s library opens after $2.8 million in upgrades
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=153
Description: Updates to the library include a redesign of the main floor and lower level, two new tutorial rooms, two program rooms, and renovated washrooms. The work maintained and refurbished the library’s original features, and also saw new shelving and furniture, a lift, a new accessible entrance and washroom, and a new reading area and playground added.


http://www.whqwl.com/Mayor_Bowman/st...39711875960832

Waverley Underpass
Waverley St. at Taylor Ave.
Display Boards: https://www.winnipeg.ca/publicworks/...playBoards.pdf
Cost: $98M
Status: Completed August 2019
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=156
Waverley Underpass - Design
Video Link



96 St. Mary's Road
Location: 96 St. Mary's Road
Developer: Prairie Commercial Inc
Architect(s): Mistecture
Status: Completed 2019
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=171
Description: 6-unit, three-storey (35 feet in height) multi-family dwelling in the St. Boniface neigborghood of Norwood Flats.




889 Grosvenor Court

Location: 889 Grosvenor AveWinnipeg, MB
Status: Completed 2018
Description: Executive Suites for Lease



Tech Offices
Location: 134 William Stephenson Way, Winnipeg, MB
Developers: Unknown
Architect(s)/Engingeers: StructureCraft Builders
Construction Manager: Unknown
Status: On Hold
Description: Two, six-storey, mass timber office buildings located in the cultural centre of downtown. The design includes ground floor commercial space and lobby access, with five floors of class A office space above. Other features include interior bleacher feature, convenience stairs, roof deck, and expansive views of the downtown. Located on 'Parcel 4' lot at The Forks in Downtown Winnipeg
Project Thread: https://forum.skyscraperpage.com/sho...d.php?t=217747
Media: Hungry officials hoping SkipTheDishes delivers itself to Railside project at The Forks
Status: On Hold
__________________
WINNIPEG | Projects and Development
In The Future Every Building Will Be World-Famous For Fifteen Minutes.

Last edited by Wpg_Guy; Nov 19, 2019 at 7:22 AM. Reason: Misericordia living, Portage Place thread link, 185 Smith, 216 Sherbrook,Uptown Theatre, 481 St. Anne’s Rd, 96 Maryland St
Reply With Quote
     
     
  #2  
Old Posted Jun 17, 2019, 1:59 PM
borkborkbork borkborkbork is offline
Registered User
 
Join Date: Jul 2014
Posts: 664
Can this thread be stickied and the IX thread be un-stickied?
Reply With Quote
     
     
  #3  
Old Posted Jun 17, 2019, 2:16 PM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is online now
Registered User
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba, Canada
Posts: 4,272
Quote:
Originally Posted by borkborkbork View Post
Can this thread be stickied and the IX thread be un-stickied?
Yes this has been requested of the mods.
__________________
WINNIPEG | Projects and Development
In The Future Every Building Will Be World-Famous For Fifteen Minutes.
Reply With Quote
     
     
  #4  
Old Posted Jun 17, 2019, 5:33 PM
roccerfeller's Avatar
roccerfeller roccerfeller is offline
Registered User
 
Join Date: Jul 2010
Location: Winnipeg
Posts: 2,774
Great job wpg guy!

Tons of developments I didn’t even know were u/c even wow haha

Looks to be a very active few years of development for winnipeg as CMA marches towards and beyond 850k
Reply With Quote
     
     
  #5  
Old Posted Jun 17, 2019, 6:06 PM
esquire's Avatar
esquire esquire is online now
Registered User
 
Join Date: Oct 2001
Posts: 24,604
Quote:
Originally Posted by roccerfeller View Post
Great job wpg guy!

Tons of developments I didn’t even know were u/c even wow haha

Looks to be a very active few years of development for winnipeg as CMA marches towards and beyond 850k
There's a lot more going on now than there was in 2008 when this construction thread was created. At the time it was basically just the handful of big institutional projects (stadium, airport, CMHR) and just about everything else was trivial. Very little was happening downtown. It's quite a change.
Reply With Quote
     
     
  #6  
Old Posted Jun 17, 2019, 6:22 PM
BuildUpWpg BuildUpWpg is offline
Registered User
 
Join Date: Nov 2014
Posts: 303
New renders for the Newport Centre upgrade...and will be renamed Rogers Centre??
Reply With Quote
     
     
  #7  
Old Posted Jun 17, 2019, 6:54 PM
EspionNoir's Avatar
EspionNoir EspionNoir is offline
Winnipeg
 
Join Date: Sep 2018
Location: Winnipeg
Posts: 416
Quote:
Originally Posted by esquire View Post
There's a lot more going on now than there was in 2008 when this construction thread was created. At the time it was basically just the handful of big institutional projects (stadium, airport, CMHR) and just about everything else was trivial. Very little was happening downtown. It's quite a change.
I find it interesting that several projects in that thread have romantic names, like Cier

Is that an abbreviation for something?
__________________
Winnipeg
Favourite Cities: New York and Chicago (Others are good too)
Reply With Quote
     
     
  #8  
Old Posted Jun 17, 2019, 7:00 PM
Arts Arts is offline
Registered User
 
Join Date: Sep 2010
Posts: 529
That's the first time I've seen a render of the Wawanesa tower - it's fantastic, will be the cherry on top of TNS!
Reply With Quote
     
     
  #9  
Old Posted Jun 17, 2019, 7:51 PM
Pinus Pinus is offline
Registered User
 
Join Date: Jul 2015
Posts: 1,285
In terms of development, that has to be the best first late of all the Wpg construction threads I've seen so far. Very impressive developments and proposals
__________________
Canada's biggest downfall: our proximity and physical attachment to 'Murca.
Reply With Quote
     
     
  #10  
Old Posted Jun 17, 2019, 7:58 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 9,357
What up with Hyatt Place? Anything happening on site?
Reply With Quote
     
     
  #11  
Old Posted Jun 17, 2019, 8:20 PM
esquire's Avatar
esquire esquire is online now
Registered User
 
Join Date: Oct 2001
Posts: 24,604
Quote:
Originally Posted by EspionNoir View Post
I find it interesting that several projects in that thread have romantic names, like Cier

Is that an abbreviation for something?
It stood for something, I just can't remember exactly what. I want to say Canadian Institute for Environmental Research???
Reply With Quote
     
     
  #12  
Old Posted Jun 17, 2019, 8:43 PM
windypeg windypeg is offline
Registered User
 
Join Date: Jul 2013
Posts: 417
Quote:
Originally Posted by esquire View Post
There's a lot more going on now than there was in 2008 when this construction thread was created. At the time it was basically just the handful of big institutional projects (stadium, airport, CMHR) and just about everything else was trivial. Very little was happening downtown. It's quite a change.
Back in '08 I never could have imagined TNS, Sutton Place, 300 Main, 390 Assiniboine, or Wawanesa happening. Although I do look back wistfully at that "Jane" proposal, would have been really nice for that stretch of Portage.
Reply With Quote
     
     
  #13  
Old Posted Jun 17, 2019, 8:54 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 9,357
^Sounds like a Drake song.

Back in 08' I never could've imagined, fresh of degrassi.. something something ahha
Reply With Quote
     
     
  #14  
Old Posted Jun 17, 2019, 9:43 PM
trueviking's Avatar
trueviking trueviking is online now
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 11,203
tower beside the WAG is at the fourth floor already. You can start to see the wacky shape.



Reply With Quote
     
     
  #15  
Old Posted Jun 18, 2019, 4:00 AM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is online now
Registered User
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba, Canada
Posts: 4,272
Quote:
Originally Posted by bomberjet View Post
What up with Hyatt Place? Anything happening on site?
From previous construction thread
Quote:
Originally Posted by optimusREIM View Post
Does anyone have any info on what's going on with the Hyatt?
Posted Jun 14, 2019, 10:30 AM
Quote:
Originally Posted by buzzg View Post
Work to resume again ASAP, with opening set for late 2020.
buzzg, does that include the addition on top of the building?
__________________
WINNIPEG | Projects and Development
In The Future Every Building Will Be World-Famous For Fifteen Minutes.
Reply With Quote
     
     
  #16  
Old Posted Jun 18, 2019, 4:49 AM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is online now
Registered User
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba, Canada
Posts: 4,272
Quote:
Originally Posted by BuildUpWpg View Post
New renders for the Newport Centre upgrade...and will be renamed Rogers Centre??
It appears in all the marketing material as that way, no official work though on it.
__________________
WINNIPEG | Projects and Development
In The Future Every Building Will Be World-Famous For Fifteen Minutes.
Reply With Quote
     
     
  #17  
Old Posted Jun 19, 2019, 12:26 AM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is online now
Registered User
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba, Canada
Posts: 4,272
RE: 201 Portage lobby renovation

Quote:
Originally Posted by buzzg View Post
Looks interesting. Would like to see the side facing P&M. I wonder if the glass is being changed so it’s not blue-green?

Also, unless it’s just a bad render, appears the skylight is gone.
Harvard has an application with the city to have the original 1987 development agreement forcing the property owner to provide a pedestrian arcade for 201 Portage amended. The plan is to have that space filled in with tenant space. There's more details on the podium refurbishment in the letter sent to the city from Stantec below. This matter is on the agenda for the June 24, 2019 Standing Policy Committee on Property and Development, Heritage, and Downtown Development meeting.


__________________
WINNIPEG | Projects and Development
In The Future Every Building Will Be World-Famous For Fifteen Minutes.
Reply With Quote
     
     
  #18  
Old Posted Jun 19, 2019, 12:50 AM
buzzg buzzg is offline
Registered User
 
Join Date: Apr 2013
Posts: 6,022
That sounds fantastic.

It is also the most quintessentially Winnipeg thing I’ve ever heard that they tried to force people off the sidewalk and into the arcade, it lasted one year, and has just been left as is for 30 years.

It’s wild they wanted to FORCE people into the arcade even though it’s not heated or even fully enclosed lol. Barely a benefit.
Reply With Quote
     
     
  #19  
Old Posted Jun 19, 2019, 1:23 AM
OTA in Winnipeg's Avatar
OTA in Winnipeg OTA in Winnipeg is offline
Registered User
 
Join Date: Mar 2016
Location: Silver Heights
Posts: 897
Reply With Quote
     
     
  #20  
Old Posted Jun 19, 2019, 11:49 AM
pspeid's Avatar
pspeid pspeid is online now
Registered User
 
Join Date: Aug 2018
Posts: 545
Hmmmm....could the 201 Portage Ave amendment be the first "domino" to fall in the eventual opening of P & M (he says hopefully)
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 3:36 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2019, vBulletin Solutions, Inc.