HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces > Halifax > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #27  
Old Posted Mar 6, 2024, 4:02 AM
OldDartmouthMark OldDartmouthMark is online now
Registered User
 
Join Date: May 2010
Posts: 8,578
Quote:
Originally Posted by ns_kid View Post
We're still likely years away, given that changes to the road network and toll plazas will have to be completed.
I would imagine the changes to the network would happen after the payment method has changed, as the toll booths and extra lanes needed to facilitate the slowdowns caused by them, would need to be functioning right up until the system changes over.

Just a guess, but I imagine they could funnel traffic as required temporarily with portable concrete barriers after the changeover, while construction happens outside the barriers.

But yes, either way, this is great news... if and when it happens.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces > Halifax > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:29 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.