Quote:
Originally Posted by JayM
Trans-Canada Highway (Highway 1) and Yellowhead Highway (Highway 16) Interchange Project
Description: This project involves the construction of a new interchange at the intersection of the Trans-Canada Highway (Highway 1) and Yellowhead Highway (Highway 16). It also includes the grade separation of the existing Yellowhead Highway and Canadian National Railway Mainline at-grade crossing. This project is expected to increase safety and reduce travel times for vehicles traveling through these currently at-grade intersections.
Total Investment: $96.5 million. Canada will contribute $21 million under the Gateways and Border Crossings Fund, and Manitoba will provide $75.5 million.
Timing: Construction is anticipated to begin in 2012 and end in early 2015.
|
Good grief , that sure seems mighty expensive for what looks like a fairly basic couple of grade separations .