Thread
:
AUSTIN | GreenWater | 4 Towers | 39 FLOORS | 38 FLOORS | 35 FLOORS | 28 FLOORS
View Single Post
#
125
Posted
Aug 19, 2013, 5:18 AM
The ATX
Moderator
Join Date: May 2006
Location: Where the lights are much brighter
Posts: 12,058
Quote:
Originally Posted by
KevinFromTexas
This does seem to be moving forward.
I wonder what this means for the designs, footprints and size (height) of the buildings.
http://www.statesman.com/news/busine...wn-site/nZRLP/
The article says the building was reduced by 70K square feet to accommodate the trees. It also said construction will start in early 2014.
__________________
Follow The ATX on X:
https://twitter.com/TheATX1
Things will be great when you're downtown.
The ATX
View Public Profile
Find all posts by The ATX