Posted Mar 20, 2018, 10:49 PM
|
Registered User
|
|
Join Date: Apr 2010
Posts: 437
|
|
Still disappointed that this is what CPS decided. I don't see the cost benefit of taking these buildings down to their core against building something new.
But, these buildings should look a lot better when done.
|