View Single Post
  #207  
Old Posted May 3, 2019, 2:07 AM
rrskylar's Avatar
rrskylar rrskylar is offline
BANNED
 
Join Date: Sep 2004
Location: WINNIPEG
Posts: 7,641
Quote:
Originally Posted by bomberjet View Post
I thought it said start construction late 2020 finishing November 2023. Seems long to me for a bridge. Whatever.

I'm also not sure what they referred to as cost effective. That would lead me to believe they're re-using the existing piers. If they're building new piers, what does that mean?
You called it on the bridge replacement months ago, floodway bridge would seem pretty straightforward considering the gap that it will span is practically water free 11 months of the year!

Don't get you guys knocking the PC's here, the speNDP were in power when the floodway was enlarged, there insistence on union labour ate up costs that could have been used on improved infrastructure relating to the floodway~

It was the speNDP that gave us the ridiculous three lane bridge over the floodway on the east side of the city on 115/15!
Reply With Quote