Quote:
Originally Posted by oldmanshirt
Does anybody have an idea how much the per mile start-up costs might be reduced by using existing track and ROW instead of new construction?
|
I'd assume a lot less. Also, with UP and the Military supporting this, it'd would be much easier to get done.