Quote:
Originally Posted by Reignman
I notice there is no interchange shown for where the Headingley by-pass will connect with Trans Canada, or where the St. Norbert bypass will connect with 75. How will these intersections be managed? I certainly hope not by signals.
|
Those intersections will likely be four-way stops until some future report as the foresight to recommend a grade-separated interchange.