Quote:
Originally Posted by Airboy
Guess we should have a thread for Kitimat Terrace. The canada LNG site is ramping up. About 500 on site now but should be 1-2000 by June as the site camp opens. There are already 2 - camps on the outskirts and more coming. At the height of construction there should be 7000 on site.
|
Are there any recent pictures of the site?