Quote:
Originally Posted by Zerton
Does Zaha's proposal involve renovating/adding to the existing structure?
|
Quote:
The rebuild plan, Kushner Companies confirmed to the Journal, includes tearing out the building’s steel frame and adding an additional 40 floors
|
It won't really be a renovation, but a rebuilding, similar in nature to the new 425 Park Avenue.
Looking at the lower levels of the tower, I would prefer the transition from the second setback to the tower be similar to the transition from the first setback.
But I'm sure they would prefer to have that open deck. The base and first setback of the building would be primarily for the retail.
https://www.dezeen.com/2017/03/23/za...cture-offices/