Thread
:
afiqnadzir collection
View Single Post
#
29
Posted
Mar 1, 2012, 5:00 AM
afiqnadzir
Registered User
Join Date: Dec 2009
Location: Kuala Lumpur
Posts: 609
i didnt know much about engineering..but i already make some research, the overhanging part must be connected very strongly to the vertical structure of the building,so it will work well.this is how it look like at construction site.
afiqnadzir
View Public Profile
Find all posts by afiqnadzir