Posted Feb 21, 2005, 6:56 AM
|
Registered User
|
|
Join Date: Jan 2002
Location: yvr/bwi
Posts: 2,675
|
|
It will likely be topped out ~spring/summer 2007, and ready for occupancy Spring 2008.
Here's a summary of the levels of the tower:
Levels:
P2 and 3: Parking
P1: Hotel and residential drop-off/ Commercial and residential loading/ Hotel valet parking/ Garbage
P1 Mezzanine: Hotel services
Ground floor: Urban food store/ Public art site/ Retail/ Live work lobby/ Residential/hotel lobby
Mezzaine/3rd: Two restaurants/ Public gardens and walkway/ Hotel restaurant and services
L 5: Spa
L 6: Amenity
L 7-15: Hotel (96 bedrooms)
L 16-17: Mechanical-elevator overrun
L 16-42: General Office Live/work (227 units)
L 43: Mechanical
L 43-60: Residential (66 units)
L 61: Residential roof garden
Note- Level 4 and 13 do not exist
|