View Single Post
  #10  
Old Posted Feb 21, 2005, 6:56 AM
phesto phesto is offline
Registered User
 
Join Date: Jan 2002
Location: yvr/bwi
Posts: 2,675
It will likely be topped out ~spring/summer 2007, and ready for occupancy Spring 2008.

Here's a summary of the levels of the tower:

Levels:

P2 and 3: Parking

P1: Hotel and residential drop-off/ Commercial and residential loading/ Hotel valet parking/ Garbage

P1 Mezzanine: Hotel services

Ground floor: Urban food store/ Public art site/ Retail/ Live work lobby/ Residential/hotel lobby

Mezzaine/3rd: Two restaurants/ Public gardens and walkway/ Hotel restaurant and services

L 5: Spa

L 6: Amenity

L 7-15: Hotel (96 bedrooms)

L 16-17: Mechanical-elevator overrun

L 16-42: General Office Live/work (227 units)

L 43: Mechanical

L 43-60: Residential (66 units)

L 61: Residential roof garden

Note- Level 4 and 13 do not exist