It looks like all the below grade concrete work is complete and they are preparing to pour the at grade slab. Back-filling continues around the base.
I noticed extensive use of cables for prestressing the concrete in all the horizontal slabs.
In the foreground can be seen pipes for what I assume is a snow/ice melting system in the parkade entry ramp.