Quote:
Originally Posted by Spocket
This will be one of the easier projects. No soil samples to take. No drilling piles. No foundation work to do at all. Garry's not that busy along that particular stretch either. Main Street may be a pickle but I suspect that Graham will be avoided for the most part with most deliveries taking place along Garry or Main. I could be wrong of course. Overall, this is about as easy it gets.
|
Wouldn't you still need an engineering study to verify the pad is still is acceptable condition and then potentially incur higher costs in the design side as you work around fitting the building to the pad that was made of a different project?