Quote:
Originally Posted by Restless 1
Still disappointed that this is what CPS decided. I don't see the cost benefit of taking these buildings down to their core against building something new.
But, these buildings should look a lot better when done.
|
I am with you on this. Makes no sense to me financially. Over 200 million and 28 months to redo a gross building. The Frost Tower cost 145 million. It would have been cheaper to just start over.