View Single Post
  #1  
Old Posted Feb 7, 2013, 3:57 PM
RyanD's Avatar
RyanD RyanD is offline
Fast. Fun. Frequent.
 
Join Date: Aug 2010
Location: Denver, Colorado
Posts: 2,987
DENVER | o2gygen | ft | 19 floors

Quote:
13th and Cherokee is a 19 story apartment building with structured parking which is to be constructed in the Golden Triangle neighborhood of Denver, Colorado. This area is immediately adjacent to and is considered part of the Central Business District. The apartment building will have a total of 289 units and 385 structured parking spaces--one space for each bedroom. The sixth floor will contain the amenities which include a state of the art fitness center, common areas, an outdoor terrace with an outdoor pool, sundeck, hot tub, fire pit, outdoor kitchen, and clubhouse/great room that will house a catering bar. The project’s units will be fashionably appointed with granite countertops, titanium finish appliances, frameless glass shower doors, satellite and cable TV, and state-of-the art, Cat-5 data connections. The modernistic design of this project was conceived to compliment the unique and stunning architecture of this neighborhood while still providing functional space. The leasing strategy is designed to appeal to tenants who make between $38,400 and $80,000. The all-in project costs are estimated at $58,384,181or $202,021 per unit. The project expects to have a LEED Silver designation. The project is the development of a 19 story apartment building located in the Golden Triangle neighborhood of Denver, just south of downtown Denver between Colfax, Speer and Lincoln Streets. The subject address is 1250 Cherokee Street. The building will have a total of 289 units with a total GSF of 407,216 for residential, amenity, and common areas, and 385 parking spaces with 15,463 GSF. The 6th floor of the building will be the amenity level which will house the workout room, pool and clubhouse.

Amenities will be plentiful and will include;

§ A state of the art fitness center
§ An outdoor terrace with grilling areas
§ Outdoor pool & Hot Tub
§ Sundeck
§ Fire pit
§ Outdoor kitchen area
§ Shade trellis
§ Clubhouse/Great Room with a catering bar, computers, coffee machines.
§ Full commercial cooking package with wall ovens, gas range, & refrigerator
§ Pool table, poker table, & shuffle board
§ Flat panel TVs in all waiting areas and elevator lobbies
§ Wiring for advanced technology features and wireless internet
§ Controlled access throughout the building

The units themselves will have upgrades such as;

§ Granite Countertops
§ Titanium Finish Appliances
§ Frameless Glass Shower Doors
§ Satellite and Cable TV Options
§ Cat-5 Data Connections

Views

The apartments start on the 6th floor, approximately 70’ above the street level. This project will enjoy uninterrupted views of the city skyline and the mountains at each level. Floor to ceiling glass in each living room will dramatically feature the outside views from the front door of each unit.

Setbacks

The south building walls for the structure were pulled in 15’ from the property line, creating an attractive pocket park.

Parking Plan

The subject property will have five floors of parking with 385 parking spaces. A simplified description is one stall per bedroom.

LEED Certification

The project should qualify for LEED Silver.
http://13cherokee.com/5073.html


http://13cherokee.com/5073.html


http://13cherokee.com/5001.html


http://13cherokee.com/5094.html


http://13cherokee.com/5115.html


http://13cherokee.com/5136.html


http://13cherokee.com/5178.html


http://13cherokee.com/5199.html

Sorry for the small renderings, it's all I could find for the time being. Construction timeframe is a slight mystery but it could start as early as Q2 2013.

EDIT: Title went all lowercase on me. Can this possibly be fixed?
__________________
DenverInfill
DenverUrbanism
--------------------
Latest Photo Threads: Los Angeles | New Orleans | Denver: 2014 Megathread | Denver Time-Lapse Project For more photos check out: My Website and My Flickr Photostream