Posted Jun 14, 2014, 10:25 PM
|
Registered User
|
|
Join Date: Apr 2014
Location: Wilmington
Posts: 472
|
|
Quote:
Originally Posted by Thoroughbred
Working on sloped garage floors with turned up perimeter guard walls...typical residential floors start at level 7... Once above this level, it should move at a rate of 4 days per floor....halfway up will accelerate to 3 day cycles....
|
Interesting, thanks!
|