Quote:
Originally Posted by Treesplease View Post
General procedure musings/questions:
So they are digging away at ag place. The only thing being dumped into trucks when I walk by is concrete chunks from the old foundations although the track hos are getting deeper. At what point do they do the shoring with the I beams etc. They can't do a three level parkade without shoring I would assume?, but the available flat space from which to dig the shoring holes is getting smaller by the day. Also, will they be linking the two parkades together underground? Only having to do one set of up/down ramps would maximize space available for parking - how far down does the existing FCC underground parkade go?
Shoring equipment is arriving on site now. There are components for a big mobile crane/auger/pile driver.

I believe they are linking to the existing FCC parkade which is 2 levels.
Reply With Quote