Quote:
Originally Posted by dsmmace
This building has a bigger footprint that I expected from the drawings. It seems different in the real world.
The parkade needs to go down about 30 ft, there will be a steady hauling of dirt and concrete out of there.
Tower crane is April???
Some minor concrete work should be starting soon.
|
I don't think the whole footprint is tower. Part of it (closer to Hill Tower III), I believe will just be street level retail.