Quote:
Originally Posted by texboy
I'd be willing to bet we'll see dirt turn within the next 5 years. SAT will have to expand... and will. This is not me guessing either, I happen to work in the industry and closely with the company doing the master plan.
|
We shall see...
How much is changing from the Vision 2050 plan (which I think was completed in 2011)?
That called for expanding Terminal A by two gates (opening in 2019) and the construction of a Terminal C (six gates) to open in 2024/2025. Obviously, that plan did not start on schedule.