A few more cancelled projects:

Cadillac Centre, on the Monroe Block site. Was to be completed in 2011.





Then in 2013, Meridian Health proposed building their headquarters on the site. It was to be finished in 2017.



Today, this site has a 536 foot tall office tower planned for it.

Executive Plaza was slated for demolition to be replaced by the 8 floor Detroit FBI Building, which was to be finished in 2009. This project was effectively cancelled in 2010.



Then there was this 5 floor office building for Wayne State Physicians Group. It was to be located at 3750 Woodward. Foundation work began in 2014, but relations between WSU and the Detroit Medical Center soon soured and its remained a hole in the ground since.



And The Vernor, another WSU project to be built on Cass at Canfield. Proposed in 2013, it was cancelled this past summer after becoming years behind schedule.