Quote:
Originally Posted by Txdev View Post
Yes, looking at Raul's excellent photo, you can see that part of the third floor deck is supported by those yellow posts, in places where there is second floor deck below it.

Where there is cantilever, they had to put in those big trusses and do a temporary deck (in blue on pic) on top of those trusses, to hold up the scaffolding which is holding up the 3rd floor deck, because the Esquire's 100 year old roof can't support that load.

The red trusses and blue temporary deck will be removed. N St Mary's will need to be closed for this, so planning after Spring Break/before Fiesta. The rest of the structure will continue to go up while that's happening.

A while back someone asked about the concrete pump thing for upper floors. I think we will see that soon too.

I don't think fire will be a big delay, but was definitely an eye-opener!
THANK YOU! I understand now. This part is what clarified much:


to hold up the scaffolding which is holding up the 3rd floor deck, because the Esquire's 100 year old roof can't support that load.

I thought that was another floor.