View Single Post
  #244  
Old Posted Sep 4, 2018, 5:51 AM
KevinFromTexas's Avatar
KevinFromTexas KevinFromTexas is offline
Meh
 
Join Date: Jul 2001
Location: Austin <------------> Birmingham?
Posts: 57,327
FAA permit for the tower crane showing the height at 400 feet. This will be the height of the crane once the building is topped out.

https://oeaaa.faa.gov/oeaaa/external...68922685&row=8

FAA permit for the building itself. This says 315 feet and 21 floors, but I would go with the building elevation numbers.

https://oeaaa.faa.gov/oeaaa/external...5370233&row=12
__________________
Conform or be cast out.
Reply With Quote