Quote:
Originally Posted by Kumdogmillionaire
Yes, if my memory serves me well(it's been a while), that building failed the wind test so it could never get built.
|
The economy was the reason for 830 South Michigan not being built, not wind tunnel issues.
You don’t think there couldn’t have been modifications made, like the addition of a dampener?