Breakdown of where some of the $100 million is going in yesterdays announcement.
Six kilometres of paving on PR 427 from PR 334 to PTH 100 near Winnipeg.
Two km of concrete rehabilitation on PTH 9 north of PTH 9A near Selkirk.
28 km of surface rehabilitation on PR 200 from PR 305 to the floodway near Winnipeg.
Nine km of paving on PTH 52 east and west of PTH 12 in Steinbach.
15 km of paving of the westbound lanes of PTH 1 from PTH 1A to PTH 13 east of Portage la
Prairie.
Seven km of paving of the eastbound lanes of PTH 1 east and west of PTH 16 west of Portage
la Prairie.
Source
Does any one feel better?