View Single Post
  #150  
Old Posted Sep 30, 2010, 2:35 PM
miaht82's Avatar
miaht82 miaht82 is offline
Registered User
 
Join Date: May 2008
Location: The Triangle
Posts: 1,316
Signage has gone up, took a few pics of it on the way in this morning, I'll post them tonight.
The top corner has the small square green "E's" and Soledad side has "Entrance" and "Embassy Suites" in black letters on the brown/bronze metal canopies. On Houston side, "Embassy Suites" and "Lüke," are in black letters on the brown metal covers over the entrances. There is a vertical sign visible from both streets. Concrete has been poured along the sidewalk, pretty low compared to the curb though, perhaps they are adding brick or pavers on top?. The offices facing Houston are already furnished and there were people in there working. It seemed to finish out pretty quickly, they originally had the open date for Sept. 2010; now it is Nov. 11th. Lüke is scheduled to open in October was originally August.
__________________
The Raleigh Connoisseur
It is the city trying to escape the consequences of being a city
while still remaining a city. It is urban society trying to eat its
cake and keep it, too.
- Harlan Douglass, The Suburban Trend, 1925
Reply With Quote