Quote:
Originally Posted by bomberjet
I drive by the site all the time. Noticed they have it levelled off at the floor shown in the photo. Almost like they weren't going any higher. Previous to that it always looked staggered. Like there were pieces of the light coloured precast sticking up to the next floor. I presume they didn't cancel the top floors and it's just the point in construction.
|
the company doing construction on the project posted 9 more floors to go on thier Instagram account so it is very safe to say that the top floors aren't cancelled..