View Single Post
  #5  
Old Posted Apr 15, 2014, 4:04 AM
North_Regina_Boy North_Regina_Boy is offline
Registered User
 
Join Date: Mar 2010
Location: Regina, SK (formerly Saskatoon)
Posts: 1,474
Hypothetical Design Only

Here are the drawings I promised earlier. These are more detailed drawings with lanes and traffic patterns shown. Please feel free to ask questions / or make suggestions.

22nd Street Access, not much has changed however the SB Circle to EB 22nd Has changed, also there is now a dedicated exit lane for cars and trucks making a right to SB Circle from EB 22nd, also right turns are now controlled by a traffic light timed so that there is no impeding traffic. The lane that feeds the NB Circle Drive loop is now separate from the Circle Drive Southbound turn lane. Vehicles going from WB 22nd to NB Circle Drive can no longer cut across to get to Laurier. Same with people attemping to do the same from Clancy across to 22nd ramp. Pedestrian crossing have been turned into overpasses to maintain cycling and pedestrian access.



Neighborhood access, Orange for North of 22nd / Purple for South of 22nd. Also fairlight drive now gives direct access to SB Circle without having to go to 22nd, lessening traffic on 22nd. Traffic can continue NB on the access ramp while vehicles on Laurier and Clancy make left turns to join flow of traffic. Similar to how Circle Drive operates now. Three lanes each way between Laurier and 33rd to facilitate proper merging.



The overpasses that allow neighborhood access.



ROAD CONSTRUCTION STAGING:

PRE-STAGE - RELOCATE POWER AND UTILITY LINES

STAGE 1 – CONSTRUCT NEW ROAD BRIDGE OVER 22ND
STAGE 2 – CONSTRUCT LANES EAST OF LAURIER CONNECT TO CIRCLE DRIVE NORTH OF LAURIER AND CONNECT TO NEW BRIDGE / CONSTRUCT NEW RAMP FROM WB 22ND TO NB CIRCLE
STAGE 3 – CONSTRUCT DETOUR AT CLANCY
STAGE 4 – BUILD NEW OVERPASS AT CLANCY / AFTER COMPLETE REMOVE DETOUR CONNECT NEW ROADWAYS WITH EXISTING RAMPS / CONSTRUCT FAIRLIGHT DR TO CIRCLE DRIVE SB CONNECTION

**CLANCY DR FULLY OPEN TO TRAFFIC**

STAGE 5 – REMOVE RAMP FROM FAIRMONT TO 22ND CREATE NEW RIGHT TURN LANE FROM EB 22ND TO SB CIRCLE
STAGE 6 – CLOSE CIRCLE DRIVE TRAFFIC TO LAURIER OPEN RAMPS AND DIRECT NORTHBOUND TRAFFIC TO NEW 22ND STREET BRIDGE AND TO NEW BYPASS RAMP SB CIRCLE DRIVE TRAFFIC DETOURED TO CONFEDERATION DR TO EXISTING SOUTHBOUND CIRCLE DRIVE RAMP
STAGE 7 – BUILD OVERPASS AT LAURIER

**LAURIER DR FULLY OPEN TO TRAFFIC**

STAGE 8 – COMPLETE FINAL TIE-INS
STAGE 9 – CONSTRUCT PEDESTRIAN OVERPASSES

Last edited by North_Regina_Boy; Apr 15, 2014 at 4:50 PM.
Reply With Quote