View Single Post
  #75  
Old Posted Dec 10, 2015, 8:57 PM
cv94117 cv94117 is offline
Registered User
 
Join Date: Mar 2013
Posts: 133
Quote:
Originally Posted by fimiak View Post
It is topped out when the highest roof steel bar is installed. It has nothing to do with the progress of the structure as a whole. The steel installation itself isn't even finished, it simply has reached its top height. It is a tradition for ironworkers to paint the this steel bar white, and to sign it.
Wrong. It represents the last main structural element which is usually also the highest. It is meant to signify the completion of the structure which this is not.