Thread
:
AUSTIN | Ashton | 412 FT / 126 M | 36 FLOORS | T/O
View Single Post
#
25
Posted
May 18, 2008, 12:37 AM
Raining Inside
BANNED
Join Date: Nov 2007
Location: ASATex Megaplex
Posts: 536
Quote:
Originally Posted by
NThomas76207
How close is it to topping out (time)?
It's got about 10 floors to go. The pace of construction on this thing has been incredibly slow. I would say the top out should be around August 1st.
Raining Inside
View Public Profile
Find all posts by Raining Inside