Breakthrough at second Site C diversion tunnel
Alaska Highway News
JULY 12, 2019
Photo By BC HYDRO
BC Hydro says it broke through the second diversion tunnel needed to divert the Peace River ahead of building the earthfill dam at Site C.
The Crown utility said it reached the milestone on Thursday, July 11, after a year of excavations.
...
https://www.alaskahighwaynews.ca/sit...aoIBbDWWJRmx2k