Posted Sep 11, 2019, 10:16 PM
|
Registered User
|
|
Join Date: Jul 2015
Posts: 820
|
|
I went there today and they were ripping out the inter-locking blocks on the second lane of Main Street. They were not ripping up the new concrete on the loading zone. I could not get close to see but it looks like there is 4 feet of sidewalk left and the doors will open out into that space.
|