Looking over the city's report on this project. It gives the floorplan for each floor. 16 above ground floors and 67.19 m to the roof (height limit here is 68m).

There is going to be 7 levels of underground parking (400 spots), 1 underground level for delivery vehicles, a six floor mall on De la Montagne, 5 floor hotel (120 rooms), 5 levels of condos (100 units), and a bar on the top floor, with an outdoor pool/terrasse (which is zoned for the hotel, so it will probably be accessible to the public).

Plan of the building from De Maisonneuve:


The cladding will be partially in glass and "metals" (and other accented materials), and partially in stone.

De la Montagne St.


De Maisonneuve Blvd:


Crescent St.:


St. Catherine St.


De Maisonneuve Blvd./De la Montagne St.


De Maisonneuve Blvd./Crescent St.


Crescent St.


It is quite a detailed document:
http://ville.montreal.qc.ca/document...25-modifie.pdf