View Single Post
  #6  
Old Posted Aug 2, 2009, 5:18 AM
jmt18325's Avatar
jmt18325 jmt18325 is offline
Heart of the Continent
 
Join Date: Apr 2009
Location: Winnipeg
Posts: 7,284
So where is the money going to come from? to turn the entire thing into a freeway (and lights will be eliminated over the next few years) would require hundreds of millions of dollars. We can't do that all at once. The lights at Saskatchewan will be gone soon as will the lights at Lagimodiere. There will also be a new arrangement where Waverly connects with the perimeter that will eventually be replaced by an overpass structure when the St. Norbert bypass is built. These things take time, but it will happen. As of now, there isn't really a traffic problem on the perimeter.