View Single Post
  #52  
Old Posted Jan 5, 2017, 10:47 PM
Bombardier Bombardier is offline
Registered User
 
Join Date: Aug 2016
Location: Chicago, IL
Posts: 467
Quote:
Originally Posted by KWILLSKYLINE View Post
Doe's anyone have a link to the schedule of this project. Just wondering if the hotel rehab is going to shut down the whole hotel or if they are going to do a floor by floor type of thing? Also will that portion coincide with the tower portion or after the tower is finished?
The whole hotel will shut down for 8 months with the reopening of the hotel occurring about the same time as the tower opening.