View Single Post
  #7225  
Old Posted Nov 10, 2020, 4:33 PM
atxsnail atxsnail is offline
Registered User
 
Join Date: Feb 2014
Posts: 551
Quote:
Originally Posted by freerover View Post
They also wanted to build a new heavy maintenance center to replace the one on Burnet but that was cut. I think they are at capacity at Burnet for the number of trains. The big thing I was looking forward to was the lengthening of the stations to allow double trains to run. Bummer.
That's right, I forgot about the station lengthening part. Hopefully the new stations are already designed with that in mind - pretty sure Downtown station can handle linked trains. McKalla with double capacity on match days would be nice. Red Line will eventually need higher capacity, though to be fair the double length would only be useful at a handful of stations. Crestview and the Park and Rides would need it most. Probably Plaza Saltillo?
Reply With Quote